| Location: | Alabama |
|---|---|
| Posted: | Oct 19, 2026 |
| Due: | Nov 10, 2026 |
| Agency: | Mobile Water Service System(MAWSS) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 26-059 |
| Publication URL: | To access bid details, please log in. |
Purchase of a Replacement Natural Gas Auxilliary Pump for Waller Bros LS027
Contract or Solicitation Number IFB 26-059
Solicitation Description
Opening Date November 10th 2026
Contact Terry Herman at (251) 378-3509 or therman@mawss.com
Solicitation Document(s)
IFB26-059NaturalGasAuxilliaryPumpWallerBrosLS027_2026-10-19-105610.pdf
| INVITATION FOR BID NUMBER | IFB 26-059 |
|---|---|
| NAME OF BID | Purchase of a Replacement Natural Gas Auxilliary Pump for Waller Bros LS027 |
| BIDS WILL BE RECEIVED AT | MAWSS Purchasing Dept. Bid Box If sending bids by UPS/Fed Ex, deliver to: East Visitor Entrance 1610 Shelton Beach Rd. Ext., Mobile, AL 36618 4725 Moffett Road Attn: Purchasing Mobile, AL 36618 with IFB# marked on envelope |
| BID OPENING DATE | November 10, 2026 |
| BID CLOSING TIME | 10:30 am Central Time |
| AWARD WILL BE MADE BY | Total Cost & Lead Time |
| MATERIAL DELIVERED TO | MAWSS - Lift Station Department 1610 Shelton Beach Road Ext. Mobile, AL 36618 |
| ADDITIONAL INFORMATION CONTACT | Terry Herman at (251) 378-3509 or therman@mawss.com |
| APPLICABLE SDP POLICY | None |
Mobile Area Water and
Sewer System
4725 Moffett Road
Mobile, AL 36618-2236
Joyce Sawyer, Buyer II PO Box 180249
(251) 694-3110 Office Mobile, AL 36618-0249
jasawyer@mawss.com
INVITATION FOR BID
OCTOBER 19, 2026
INVITATION FOR BID NUMBER IFB 26-059
NAME OF BID Purchase of a Replacement Natural Gas Auxilliary Pump for Waller Bros LS027
MAWSS Purchasing Dept. Bid Box If sending bids by UPS/Fed Ex, deliver to:
East Visitor Entrance 1610 Shelton Beach Rd. Ext., Mobile, AL 36618
BIDS WILL BE RECEIVED AT
4725 Moffett Road Attn: Purchasing
Mobile, AL 36618 with IFB# marked on envelope
BID OPENING DATE November 10, 2026
BID CLOSING TIME 10:30 am Central Time
AWARD WILL BE MADE BY Total Cost & Lead Time
MAWSS - Lift Station Department
MATERIAL DELIVERED TO 1610 Shelton Beach Road Ext.
Mobile, AL 36618
ADDITIONAL INFORMATION CONTACT Terry Herman at (251) 378-3509 or therman@mawss.com
APPLICABLE SDP POLICY None
Sealed bids must be in the Purchasing Department no later than the time specified to be considered. Submissions received
after the deadline will not be considered. Envelopes must bear the name of the supplier, company address and the words "IFB
26-059 Natural Gas Auxilliary Pump" or "IFB 26-059 NO QUOTE." Facsimile or email bids will not be accepted.
All bids must be submitted on the attached forms, or your bid will be disqualified. Bidder shall furnish all the information
required by the solicitation. The bidder's name must be typed or printed on the bid sheet and signed by the bidder or
appropriate authorized executive officer of the bidder's company. Bidders must initial any changes or erasures. Bidders should
retain a copy of bids for their records.
Bidders shall acknowledge receipt of all addenda to this solicitation by signing and returning each addendum or by identifying
the addendum number and the date on the bid form. Failure to acknowledge receipt of any addendum by a bidder will result
in rejection of the bid if MAWSS determines that the addendum contains information that materially changes the requirements.
All bids shall be quoted FOB Destination, freight prepaid with no additional charges. Unless otherwise specified in the bid, all
prices will be on a firm-fixed price basis and are not subject to adjustments based on costs incurred. MAWSS reserves the right
to reject any or all bids submitted, to waive any informality in any bid or in the bid process, or to terminate the bid process at
any time, if deemed by MAWSS to be in MAWSS's best interest.
A Purchase Order and this "Invitation for Bid" with "Specifications," "Conditions," "Bid Form," signed by the successful bidder's
authorized representative, and all attached drawings and other documents furnished by MAWSS to the bidders with the
Invitation for Bid in order to illustrate the contract requirements, will constitute a contract for the goods and/or services to be
purchased.
IFB 26-059 Natural Gas Auxilliary Pump Page 1 of 10
IFB 26-059 NATURAL GAS AUXILLIARY PUMP
CONDITIONS
The Board of Water and Sewer Commissioners of the City of Mobile will accept bids for the Natural Gas Auxilliary Pump in our
Purchasing Department Bid Box located at the East Visitor Entrance at 4725 Moffett Road, Mobile, AL. 36618 no later than
10:30 a.m. local time on November 10, 2026. Bids will be opened immediately after bid closing time in the Operations Center
Board room located at the East Visitor Entrance. Award will be by Total Cost & Lead Time. The bidder offers and agrees, if this
bid is accepted, to furnish the items as defined in the specifications for the unit price set opposite each item. Pricing shall be
FOB Mobile, Alabama. All items shall be delivered to our Lift Station Dept. located at 1610 Shelton Beach Rd. Ext., Mobile, AL
36618 or to the job site as needed. The bidder shall state the expected length of delivery time on the Bid Form.
Bidder understands and agrees that manufacturer and part numbers are provided for descriptive purposes only. Items of equal
or better quality will be considered but must be approved by MAWSS in writing. Upon delivery, if the quality, durability or
performance of any product represented as equal or better is determined by MAWSS to be unsatisfactory, MAWSS will require
a suitable substitute or will require that the originally specified item be delivered, at the unit price originally offered by bidder.
No substitution for items to be provided pursuant to this contract shall be permitted during the contract period without the
express written consent of MAWSS. All items provided shall be for commercial use and for the purposes reflected in the
contract documents.
No bid on closed out or discontinued item(s) will be accepted. Item(s) that have a determinable shelf life must be disclosed at
the time of bid submittal. Bidder understands that his/her bid shall be good and may not be withdrawn for a period of sixty
(60) calendar days after the scheduled closing time for receiving bids.
MAWSS reserves the right to reject any or all bids submitted, to waive any informality in any bid or in the bid process, or to
terminate the bid process at any time, if deemed by MAWSS to be in MAWSS's best interest.
Bidder understands and agrees that quantities will be purchased by MAWSS on an "as needed" basis to replenish inventory.
MAWSS shall not be committed to the purchase of a pre-established minimum quantity for any one item.
A bidder may not modify its bid after bid opening. Errors in the extension of unit prices stated in a bid or in multiplication,
division, addition or subtraction in a bid may be corrected by the MAWSS Purchasing Buyer prior to award. In such cases, unit
prices shall not be changed.
It is the responsibility of the bidder to determine prior to the bid opening whether any amendment, additions, deletions or
changes of any type have been made to this Invitation for Bid, Conditions, Specifications, Bid Form or any other bid documents.
Bid documents and any amendments made to this bid will be posted on our website at www.mawss.com.
Invoices should be emailed to Accounts Payable at AcctsPayable@mawss.com.
END OF CONDITIONS
IFB 26-059 Natural Gas Auxilliary Pump Page 2 of 10
IFB 26-059 NATURAL GAS AUXILLIARY PUMP
SPECIFICATIONS
Waller Bro. LS027 Replacement Natural Gas Auxiliary Pump
This bid is for the replacement of a Godwin CD150S six-inch skid mount pump with a natural gas engine. The
frame dimensions and pipe flange orientation shall be the same as a Godwin CD150S so MAWSS does not have
to reconfigure piping and the unit will fit on the current mounting pad. This unit will be replacing the existing
Godwin at Waller Brother LS027.
ENGINE DRIVEN STAND-BY PUMP SPECIFICATION SHEET
Service: Sewage
Type of Pump: Engine Driven, Fully Automatic Dry Priming, Vacuum Assisted, Run Dry, Heavy Duty Solids
Handling, Horizontal Self-Priming Pump
PART 1 GENERAL
1.01 REFERENCES
A. The following is a list of standards which may be referenced in this section:
1. American Bearing Manufacturers' Association (ABMA).
2. Hydraulic Institute Standards.
3. National Electrical Manufacturer's Association (NEMA): MG 1, Motors and
Generators.
4. Occupational Safety and Health Administration (OSHA).
1.02 DEFINITIONS
A. Terminology pertaining to pumping unit performance and construction shall conform to
the ratings and nomenclature of the Hydraulic Institute Standards.
1.03 SUBMITTALS
A. Action Submittals
1. Shop Drawings:
a. Make, model, weight, and horsepower of each equipment assembly.
b. Complete catalog information, descriptive literature, specifications, and
identification of materials of construction.
c. Performance data curves showing head, capacity, horsepower demand,
and pump efficiency over entire operating range of pump from shutoff
to maximum capacity. Indicate separately the head, capacity, horsepower
demand, overall efficiency, and minimum submergence required at
guarantee point.
IFB 26-059 Natural Gas Auxilliary Pump Page 3 of 10
d. Detailed structural, mechanical, and electrical drawings showing
equipment dimensions, size, and locations of connections and weights of
associated equipment.
e. Power and control wiring diagrams, including terminals and numbers.
Include all signal interfaces with the site RTU as shown on the Drawings.
f. Complete motor nameplate data, as defined by NEMA, motor
manufacturer.
g. Factory finish system data sheets.
h. Power requirements for the battery charger and the jacket water heaters
associated with the portable pump. Physical dimensions, enclosure type,
and location for the battery charger and associated batteries.
i. Operation, Service & Parts manuals for the Pump, Engine & Control
Panel included with wiring diagrams and schematics for the Pump,
Engine and Control Panel.
B. Informational Submittals
1. Factory Functional Test Reports.
2. Manufacturer's Certificate of Compliance, in accordance with Section 01 61 00,
Common Product Requirements, that factory finish system is identical to the
requirements specified herein.
3. Special shipping, storage and protection, and handling instructions.
4. Manufacturer's printed installation instructions.
5. Suggested spare parts list to maintain the equipment in service for a period of 1
year and 5 years. Include a list of special tools required for checking, testing,
parts replacement, and maintenance with current price information.
6. List special tools, materials, and supplies furnished with equipment for use prior
to and during startup and for future maintenance.
7. Operation and Maintenance Data: As specified in Section 01 7823, Operation
and Maintenance Data.
8. Manufacturer's Certificate of Proper Installation, in accordance with Section 01
43 33, Manufacturers' Field Services.
1.04 EXTRA MATERIALS
A. Furnish for each pump
1. Operation and Maintenance Manual.
IFB 26-059 Natural Gas Auxilliary Pump Page 4 of 10
PART 2 PRODUCTS
2.01 GENERAL
A. Coordinate pump requirements with drive manufacturer and be responsible for pump and
drive requirements.
B. Where adjustable speed drives are required, furnish a coordinated operating system
complete with pump, drive, and speed controller.
C. The portable by-pass pump specified will be used to pump raw sewage.
D. The pump manufacturer shall supply the pump and specified accessories.
E. The only acceptable manufacturers shall be:
1. Cornell
2. Pioneer
3. Godwin
F. Design Requirements
1. Max Flow
2. Minimum Solid Handling Size 3 Inches
3. Max TDH
4. Minimum Suction Lift 20 Feet
5. Max Operating Speed 2200 RPM
6. Suction Connection 6" 150# ANSI B16.5
7. Discharge Connection 6" 150# ANSI B16.5
G. The bid item shall be delivered to the owner within 24 weeks of issuance of order and
order to proceed as per bid specifications.
2.02 SUPPLEMENTS
A. Some specific requirements are attached to this section as supplements.
2.03 COMPONENTS
A. The pump shall be fitted with fully automatic priming system and full flow discharge
check valve. The priming system shall be capable of priming the pump from a completely
dry pump casing, and by design will not discharge pumpage into the atmosphere. The
pump must be capable of running totally dry for periods of up to 24 hours, then re-priming
and returning to normal pumping volumes. Priming systems that require manual water
additions to facilitate pump priming are not acceptable. A demonstration of the pumps
IFB 26-059 Natural Gas Auxilliary Pump Page 5 of 10
ability to repeatedly cycle from dry suction/pump/snore/pump shall be required. This will
necessitate the draining of all residual water from the pump case to initiate dry suction
starting conditions.
B. The sound attenuation enclosure shall be critical grade. Noise level 69DBA at 30 feet.
C. The pump shall be capable of station suction lifts to 20 vertical feet. It shall also be
capable of operation using extended suction lines.
D. The unit shall have a thermostatically controlled 110V ac block heater. The electrical
ratings of the heater shall not exceed 500W.
E. The equipment shall include a 12V battery, and associated battery charger, to allow for
remotely starting the equipment at any time. The battery and battery charger shall be
included in a weatherproof enclosure to protect them from direct exposure to the
elements. The battery charger shall operate on 120V single-phase ac and the electrical
demand shall not exceed 20A.
F. Casing, suction cover, separation tank: Pump castings shall be ductile iron ASTM A536
Grade 80- 55-06. Pump design shall incorporate a direct suction flow path that is in
axial alignment with the impeller eye. There shall be no turns, chambers or valves
between the suction flange and the impeller eye. There shall be an easily accessible
drain valve from the volute to drain the water in freezing conditions.
G. Casing, suction cover, separation tank: Pump castings shall be ductile iron ASTM A536
Grade 80- 55-06. Pump design shall incorporate a direct suction flow path that is in
axial alignment with the impeller eye. There shall be no turns, chambers or valves
between the suction flange and the impeller eye. There shall be an easily accessible
drain valve from the volute to drain the water in freezing conditions.
Impeller: The pump impeller shall not be macerating type and fabricated from Stainless
Steel or Cast Chromium Steel and shall be Brinell 220 HB or equivalent.
H. Wear Plates: Shall be fully replaceable and adjustable, fabricated of ASTM A48 Class 30
material. Wear plate clearances shall have no relationship to the ability of the pump to
achieve
I. Bearings and shafts: Pump shall be fitted with bearing bracket to contain the shaft and
bearings. Bearings shall be open single row bearings of adequate size to withstand
imposed loads for sustained pumping at maximum duty points. Minimum ISO LIO
bearing life to be 100,000 hours. Impeller shafts shall be fabricated of 1144 stress proof
steel.
J. Seals: Seals shall be high pressure, mechanical self-adjusting type with silicon carbide
faces capable of withstanding suction pressure to 100 psi. The mechanical seal shall be
cooled and lubricated in an oil bath reservoir, requiring no maintenance or adjustment.
Pump shall be capable of running dry, with no damage for periods up to 24 hours. All
metal parts shall be of stainless steel. Elastomers shall be Viton. Pump should be equipped
with oil site glass for level indication.
K. Pump suction and discharge fittings: Fittings shall be flanged fittings in accordance with
Section 40 27 01, Process Piping Specialties. The manufacture shall provide (2) two Cam-
Lock fittings. The size will be determined by suction and discharge size of the pump.
L. Pump gaskets: Gaskets shal1 be compress fiber and/or Teflon.
IFB 26-059 Natural Gas Auxilliary Pump Page 6 of 10
M. Drive unit: The drive unit shall be water-cooled natural gas engine. Engine shall drive
pump by use of direct connected intermediate drive plate. Starter shall be 12 volt electric.
Safety shut down switches for low oil pressure and high temperature shall be provided.
Battery shall have 180 Amp hour rating. Unit shall include a tachometer and an hour
meter. Unit shall be a Ford MSG-425 or equal, rated at 44 hp (continuous) at 2200 RPM
(Natural Gas). A certified continuous duty engine curve shall be supplied to the owner.
The engine shall be complete with a primary fuel filter and JIC fittings on the fuel lines.
The unit shall have an engine coolant reservoir. The unit shall include oil and coolants
drain service hoses.
N. Exhaust: Exhaust system shall include muffler and anti-rain flapper device.
2.04 INSTRUMENTATION AND CONTROLS
A. Automatic Engine/Pump Controller: Fully programmable microprocessor engine control
system allowing for inputs from level, flow, pressure transducers or float switches.
Manual, automatic, and remote state functions. Programmable relays with selectable
features including pump running failure. RS-232 and RS-485 communication ports for
communication with SCADA and alarm equipment. Unit shall be capable of auto
throttling engine RPM in response to changing pressure/leve1f1ow transducer signals.
Maintains event history of all warning alarms up to 32 signals. User pre-set for engine
RPM to maintain flow and head parameters when running unattended. Unit shall track
oil and filter usage and alter operator when replacement is recommended. Diesel engine
warm up and cool down cycle. And shall be programmable for weekly scheduled auto
starts.
B. Input/Output with the site control system.
1. Accept the following discrete input, which will be an unpowered contact.
a. When this contact is received, engine shall run. When contact opens,
engine shall not run.
2. Provide the following discrete outputs. Each output shall be SPDT, Form C and
rated for 30Vdc at 10 max.
a. Engine Running.
b. Common Alarm.
3. Accept the following analog input, which will be a 4 -20 mAdc signal.
a. Speed adjusts command. At 4 mAdc, adjust pump speed to minimum
RPM. At 20 mAdc, adjust pump speed to maximum RPM. Between 4
and 20 mAdc, linearly adjust engine speed in proportion to current.
2.05 WARRANTY
A. The manufacturer shall furnish the following to the owner: a copy of the engine
manufacturer's parts and labor warranty, a 2-year parts and labor warranty issued by the
manufacturer on the portable bypass pump system. This warranty must cover all pump
parts, including the mechanical seal.
IFB 26-059 Natural Gas Auxilliary Pump Page 7 of 10
2.06 ACCESSORIES
A. Equipment Identification Plate: 16-gauge stainless steel with I14-inch die stamped
equipment tag number securely mounted in a readily visible location.
B. Lifting Lugs: Equipment weighing over 100 pounds.
C. OSHA-approved coupling guard for direct coupled or belt driven pumps.
D. Enclosure: The enclosure shall be Type 316 stainless steel or heavy powder coat finish
and include the following capabilities and components: lifting ports, lockable enclosure
battery box, lockable enclosed control panel, and lockable enclosed engine housing.
There shall be no plastic components, and all wall panels shall be reinforced with cross
beams and ridged.
E. Governor: Governor shall be a mechanical type. Engine speed shall be adjustable to
operate the pump between maximum and minimum design operation speeds.
F. Two permanently mounted twist lock pigtails coming from the controller mounted to the
exterior of the enclosure with dust caps. The mating pigtails shall also be provided.
1. "A" shall be for the control floats.
2. "B" shall be for the SCADA outputs.
G. Murphy Type Engine Controller
H. On/Off & High Level Floats
I. There shall be a separate display with two gauges mounted together where visible inside
the pump enclosure. A vacuum gauge to monitor pump intake pressure (PIP), and a
pressure gauge to monitor pump discharge pressure (PDP).
2.07 FACTORY FINISHING
A. Prepare, prime, and finish coat in accordance with Section 099000, Painting and Coating.
The surface color shall match Sherwin-Williams SW7716 Croissant.
2.08 SOURCE QUALITY CONTROL
A. Factory Inspections: Inspect control panels for required construction, electrical
connection, and intended function.
B. Factory Tests and Adjustments: Test equipment and control panels actually furnished.
C. Factory Test Report: Include test data sheets, curve test results, certified correct by a
registered professional engineer.
D. Functional Test: Perform manufacturer's standard, motor test on equipment. Include
vibration test, as follows:
1. Dynamically balance rotating parts of each pump and its driving unit before final
assembly.
IFB 26-059 Natural Gas Auxilliary Pump Page 8 of 10
2. Limits:
a. Driving Unit Alone: Less than 80 percent of NEMA MG 1 limits.
b. Complete Rotating Assembly Including Coupling, Drive Unit, and
Motor: Less than 90 percent of limits established in the Hydraulic
Institute Standards.
PART 3 EXECUTION
A. Performance Test:
1. Conduct on each pump.
2. Perform under simulated operating conditions.
3. Test for a continuous I-hour period without malfunction.
4. Test Log: Record the following:
a. Total head.
b. Capacity.
c. Horsepower requirements.
d. Flow measured by factory instrumentation and storage volumes or
flowmeters on discharge piping.
e. Average distance from suction well water surface to pump discharge
centerline for duration of test.
f. Pump discharge pressure converted to feet of liquid pumped and
corrected to pump discharge centerline.
g. Calculated velocity head at the discharge flange.
h. Field head.
i. Driving motor voltage and amperage measured for each phase.
5. Adjust, realign, or modify units and retest in accordance with Hydraulic Institute
Standards if necessary, at Contractor's sole expense.
3.02 MANUFACTURER'S SERVICES
A. Manufacturer's Representative: Present at Site designated by Owner
1. 1/2 person-day for installation assistance and inspection
2. The vendor shall provide a onetime service to the pump drive engine once the
"Break-in Period" has been reached per the engine manufacture recommendation
END OF SPECIFICATIONS
IFB 26-059 Natural Gas Auxilliary Pump Page 9 of 10
| Qty | Item | Mfr/Model | Unit Cost |
|---|---|---|---|
| 1 ea | Natural Gas Auxilliary Pump | ||
| 1 ea | Freight or other Misc. charges, if applicable | ||
| TOTAL COST* |
IFB 26-059 NATURAL GAS AUXILLIARY PUMP
BID SHEET
Qty Item Mfr/Model Unit Cost
Natural Gas Auxilliary
1 ea
Pump
1 ea Freight or other Misc. charges, if applicable
TOTAL COST*
*Total cost must include all charges/fees, including but not limited to, freight, tariffs, etc.
Delivery (ARO): ____
(After receipt of order)
Company Name Payment Terms
Address
City, State, Zip
Submitted By Title
Please Print
Phone Email Address
Please Print
The signer declares under penalty of perjury that she/he is authorized to sign this document and bind the company or
organization to all terms and conditions of this agreement.
Signature _______ Date
IFB 26-059 Natural Gas Auxilliary Pump Page 10 of 10

With GovernmentContracts, you can:
Annual Contract for Mowing and Grounds Maintenance - Zones 1-12 Contract or Solicitation
Mobile Water Service System(MAWSS)
Bid Due: 12/03/2026
Bid Details Title Janitorial Services - Areas 2,3, and 4 Description Janitorial Services
Shelby County
Bid Due: 11/24/2026
Sourcing Project Number: SRC0000037463 Solicitation Label: Recycling Services FY 27 Status: Open for
State Government of Alabama
Bid Due: 11/20/2026
Housekeeping Services for ADMH Facilities State of Alabama Department of Mental Health Central
Alabama Department of Mental Health
Bid Due: 11/20/2026