| Location: | New York |
|---|---|
| Posted: | May 12, 2025 |
| Due: | Jun 17, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: The facility has a single incoming utility service of 13.2kv. Backup power is provided by a single 500KW (CAT) diesel generator. The incoming utility breaker is located in the switchgear building #40 along with the generator breaker, three feeder breakers and one spare. The breakers are 5-15kv Cutler-Hammer air circuit breakers. The generator breaker has a GE 489 protective relay and the other four breakers have GE 750 protective relays. The switchgear battery backup is a 130volt (60) Fiamm SD-7. The facility has 12 MV Pad Mount Transformers and 10 MV Pad mount Non-automatic switches completing the high voltage distribution. All equipment is to be serviced using this listed scope of work. Contractor to provide generators and connect to critical buildings to maintain power during service, may have to be done during off hours. To be coordinated by the facility. Install UL listed Infra-Red windows in the incoming switchgear cabinets. All work must be bid using prevailing wage rate. ARC FLASH SAFETY AWARENESS TRAINING
SERVICE AND TESTING OF MEDIUM VOLTAGE SWITCHGEAR & TRANSFER SWITCHES SERVICE AND TESTING OF AUTOMATIC TRANSFER SWITCHES SERVICE AND TESTING OF MEDIUM VOLTAGE VACUUM CIRCUIT BREAKERS SERVICE AND TESTING OF BATTERY SYSTEMS SERVICE AND TESTING OF MOTOR CONTROL CENTERS SERVICE AND TESTING OF OIL FILLED TRANSFORMERS SERVICE AND TESTING OF DRY TYPE TRANSFORMERS SERVICE AND TESTING OF LOW VOLTAGE AIR SWITCHES TESTING AND CALIBRATION OF PROTECTIVE RELAYS PARTIAL DISCHARGE TESTING: Partial Discharge Testing of its medium voltage primary cables, terminations, splices, and connected equipment using Doble Online PD Testing System. DOCCS will require 2 copies of the engineered report with risk category evaluation. QUALIFICATIONS: The Contractor shall have the study prepared by qualified engineers of an independent consultant. The consultant shall be a Registered Professional Electrical Engineer licensed in NY State who has at least ten (10) years of experience and specializes in performing power system studies. Due Date: 06/17/2025 10:00 AMContract Term: 1 Year Location: Hale Creek Correctional Facility, 279 Maloney Rd, Johnstown, NY 12095 Ad Type: Discretionary procurements between $50,000 and $750,000
|

With GovernmentContracts, you can: