| Location: | Washington |
|---|---|
| Posted: | May 12, 2025 |
| Due: | Jun 4, 2025 |
| Agency: | State Government of Washington |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | XE3640 |
| Publication URL: | To access bid details, please log in. |
Roadway excavation, shoulder finishing, pavement repair, drainage, crack sealing, planing bituminous pavement, hot mix asphalt (HMA) for pre-leveling and pavement repair, HMA paving, erosion control, extruded curb, guardrail, guideposts, pavement markings, signing, rumble strips, structure excavation, concrete slope protection, traffic control and other work. Involves 64 items. and 44 working days. Work class 4, asphalt paving.
Join Team Meeting or dial in +1 (206) 531-0324 Access Code 524-008-947# (available 10:30 a.m. on bid day - bids opened after 11:00 a.m.) New to Teams? Learn more here .
Project information availableYou can find plans and specifications, plan holder lists, addenda, reference information, questions and answers and other contract documents in the I-90, BNRR Bridge to Geiger Rd - Paving archive.
Learn how to bid on a highway, ferry terminal or facility contract from getting prequalified to submitting your request to bid and learn how to bid electronically using BidX.com .

With GovernmentContracts, you can:
...,Concrete Resurfacing Services,Concrete/Formed/Flatwork/Foundation,Crack Sealing Repair..., Crack Sealing Repair and/or Maintenance, Culinary Water Improvements, ...
City of Wenatchee
Bid Due: 6/16/2026
...sealing, hot mix asphalt (HMA) pavement repair at select locations, temporary traffic control ...
State Government of Washington
Bid Due: 7/01/2026