| Location: | New York |
|---|---|
| Posted: | Apr 17, 2025 |
| Due: | May 8, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: Bids will be received for the following Contract: Orange Turnpike, Pine Tree Road, Still Road, and Stage Road Traffic Signal Installation This work includes the installation of a traffic signal at the intersection of Orange Turnpike, Pine Ridge Road, Stage Road, and Still Road. Construction will include work zone traffic control, traffic signal installation, installation of subbase and asphalt pavement, drainage structure modification, signing, pavement striping, and box beam guide railing installation. The owner of this contract is the Village of Monroe. Due Date: 05/08/2025 11:00 AMContract Term: 240 Calendar Days Location: Intersection of Orange Turnpike, Pine Tree Road, Still Road, and Stage Road T Ad Type: General
|

With GovernmentContracts, you can:
...is proposing to rehabilitate the pedestrian pathway and its associated railings, stabilize the ...
Westchester County
Bid Due: 6/18/2026
...with a new facade, entry stairs, doors, and railings shall be demolished and ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/11/2026
...submission will not be considered. Work consists of replacement of damaged white thermoplastic ...
Port Chester village
Bid Due: 7/02/2026