| Location: | Kentucky |
|---|---|
| Posted: | Jun 17, 2026 |
| Due: | Jul 10, 2026 |
| Agency: | City of Bowling Green |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-19 |
| Publication URL: | To access bid details, please log in. |
Project Description: This ITB is for the construction of approx. 2,600 LF of 5’ wide concrete sidewalk along Ridgecrest Way, from Smallhouse Road to Rodes Drive, to improve pedestrian safety. The project will include the installation of a new 5’ concrete sidewalk, construction of ADA compliant ramps at designated locations, and drainage improvements. Work will consist of, but is not limited to, sidewalk construction, tree removal and trimming, storm pipe installation, grading, and restoration of disturbed areas. All work shall be completed in accordance with City specifications.

With GovernmentContracts, you can:
...constituents. The affected area is currently characterized by dense tree cover. Remediation activities... ...
City of Louisville, Kentucky
Bid Due: 7/20/2026
...; 7. Hazardous tree and limb removal; 8. Documentation and load tracking services ...
City of Hopkinsville
Bid Due: 8/11/2026