| Location: | Kentucky |
|---|---|
| Posted: | Jun 17, 2026 |
| Due: | Jul 10, 2026 |
| Agency: | City of Bowling Green |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-19 |
| Publication URL: | To access bid details, please log in. |
Project Description: This ITB is for the construction of approx. 2,600 LF of 5’ wide concrete sidewalk along Ridgecrest Way, from Smallhouse Road to Rodes Drive, to improve pedestrian safety. The project will include the installation of a new 5’ concrete sidewalk, construction of ADA compliant ramps at designated locations, and drainage improvements. Work will consist of, but is not limited to, sidewalk construction, tree removal and trimming, storm pipe installation, grading, and restoration of disturbed areas. All work shall be completed in accordance with City specifications.

With GovernmentContracts, you can:
...& cover board. Tapered insulation shall be used at all drainage crickets & ...
State Government of Kentucky
Bid Due: 10/20/2026
...of the project, two portals producing drainage are compromising stability within a pasture ...
State Government of Kentucky
Bid Due: 11/03/2026
..., and air conditioning (HVAC) work; Civil, site, drainage, earthwork, and related utility ...
DEPT OF DEFENSE
Bid Due: 9/16/2027
...be used at all drainage crickets & saddles & around the existing RTU. ...
State Government of Kentucky
Bid Due: 10/20/2026