| Location: | Georgia |
|---|---|
| Posted: | Apr 19, 2026 |
| Due: | Apr 23, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912HN26BA009 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform Brunswick Harbor Modifications Project located in Glynn County, GA.
This request does not obligate the Government in any way to post a solicitation or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS is 237990 with a size 37 million. The potential magnitude for this requirement, per DFARS 236.204(i), is estimated between $10,000,000 and $25,000,000 dollars. Inquiry will only be accepted via email to Contract Specialist, Mr. Rohan Bryan at rohan.a.bryan@usace.army.mil, or Contracting Officer, Mr. Chad Arnett at chad.a.arnett@usace.army.mil. The request for Information Sheet should be completed and submitted no later than April 23, 2026, at 3:00 pm, Eastern Standard Time (EST).
THIS IS NOT A SOLICITATION. THIS POSTING IS A SOURCES SOUGHT NOTICE ONLY.
The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island.
Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.
| Apr 28, 2026 | [Presolicitation (Original)] Pre-solicitation - Brunswick Harbor Modifications Project, Glynn County, GA. |
| May 15, 2026 | [Solicitation (Original)] BRUNSWICK HARBOR MODIFICATIONS PROJECT BRUNSWICK HARBOR, GA |
| May 29, 2026 | [Solicitation (Updated)] BRUNSWICK HARBOR MODIFICATIONS PROJECT BRUNSWICK HARBOR, GA |

With GovernmentContracts, you can:
Project Project No. Advertise Date Bid Date Johnson Ferry Road at Shallowford Road
Cobb County Transportation
Bid Due: 6/11/2026
Project ID: 2026-027-ITB Title: Machine Shop Services (Three (3) year Multi-year Contract) Addenda:
DeKalb County
Bid Due: 6/08/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77832-NONST-2026-000000012
State Government of Georgia
Bid Due: 7/06/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-62960-NONST-2026-000000114
State Government of Georgia
Bid Due: 6/09/2026