| Location: | California |
|---|---|
| Posted: | Oct 25, 2024 |
| Due: | Nov 14, 2024 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 949000.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | Wooden Center Seismic Improvements - BP04 Demolition and Finish Protection) |
| Project Number | 949000.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited from prequalified Demolition and Finish Protection subcontractors for the following work:
The cost of all necessary labor, material, equipment, access, debris removal, supplies, and supervision required to complete the work per the contract documents and as noted below: The Demolition scope will include, but is not limited to, removal and disposal of various structural and building components, including slab-on-grade concrete, elevated concrete, site concrete, asphalt, fencing, ceilings, walls, MEPF systems, casework, roofing and insulation for the installation of the bond beam, and brick. The Finish Protection scope will include the set-up, tear-down and maintenance of the walls and floor protection. All scaffolding and equipment required to perform the work in this bid package shall be provided by this subcontractor unless specifically noted. Include debris boxes for the full scope duration. Include protection of surrounding finishes for demolition. The Trade Contractor is responsible for coordinating with Plant Construction and all other subcontractors, particularly the MEP and Salvage contractors. It will also require multiple coordination meetings with the project architect, structural engineer, Plant, and various State and UCLA Agencies. This is an occupied building and a phased project. Multiple mobilizations are required per the contract documents and project schedule. NOTE: The successful bidder’s subcontract with be with Plant Construction Company, the CM/Contractor on this project. The work of this project is currently anticipated to begin in December 2024. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $3,480,000.00 |
| 949000.01 |

With GovernmentContracts, you can:
...Wholesalers Wholesale Trade 423320: Brick, Stone, and Related Construction Material Merchant Wholesalers...
City of Los Angeles
Bid Due: 6/10/2026
...and Quarrying Mining 423320: Brick, Stone, and Related Construction Material Merchant Wholesalers...
City of Los Angeles
Bid Due: 6/18/2026
...and Pipe Fitting Manufacturing Manufacturing 327331: Concrete Block and Brick Manufacturing...
City of Los Angeles
Bid Due: 7/01/2026
..., cans, bottles, bricks, boxes, appliances, vehicle parts, tires, discarded mattresses, equipment...
Lake County
Bid Due: 6/24/2026