Replacement of concrete walkways
| Location: |
Massachusetts |
| Posted: |
Jul 2, 2025 |
| Due: |
Jul 22, 2025 |
| Agency: |
Commonwealth of Massachusetts |
| Type of Government: |
State & Local |
| Category: |
- 56 - Construction and Building Materials
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
BD-22-1221-MOD00-MOD-118390 |
| Publication URL: |
To access bid details, please log in. |
Bid Solicitation: BD-22-1221-MOD00-MOD-118390
|
|
Header Information
|
|
Bid Number:
|
BD-22-1221-MOD00-MOD-118390
|
Description:
|
Replacement of concrete walkways
|
Bid Opening Date:
|
07/22/2025 02:00:00 PM
|
|
Purchaser:
|
Trent Carter
|
Organization:
|
New Bedford Housing Authority
|
|
Department:
|
MOD001 - Modernization
|
Location:
|
MOD - Modernization Office
|
|
Fiscal Year:
|
22
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
07/02/2025 12:00:00 AM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
A Pre-bid conference shall be held on Wednesday July 9, 2025, at 9:00 am. The meeting will begin at the Madison Street on-street parking area located near 242 Acushnet Avenue Street, New Bedford, MA 02740.
|
|
Bulletin Desc:
|
Installation of erosion control measures, tree protection; saw cutting asphalt /concrete; removal, disposal of existing bituminous concrete and concrete walkways/areas; disposal of excavated material; remove, reset curbing; furnish, install new precast concrete & granite curb; installation of root barrier; tree root pruning, preparing walkway subgrade; concrete and subgrade material testing; protection of work; loam, seed areas; construction of concrete walkways and ADA accessible ramps areas.
|
|
|
Ship-to Address:
|
Trent Carter - Office of Modernization
New Bedford Housing Authority
128 Union Street; 4th Floor
New Bedford , MA 02740
US
Email: trent.carter@nbha-ma.org
Phone: (508) 997-4852
|
Bill-to Address:
|
Trent Carter - Office of Modernization
New Bedford Housing Authority
128 Union Street; 4th Floor
New Bedford , MA 02740
US
Email: trent.carter@nbha-ma.org
Phone: (508) 997-4852
|
Print Format:
|
Bid Print
|
File Attachments:
|
logo.doc
Bay Village Phase III Walkways
|
Form Attachments:
|
|
|
Required Quote Attachments
|
|
|
|
Item # 1:
(
72-13
-
00
)
|
The Project consists of: installation of erosion control measures and tree protection; saw cutting of asphalt and concrete; removal and disposal of existing bituminous concrete and concrete walkways/areas; disposal of excavated material; remove and reset curbing; furnish and install new precast concrete & granite curb; installation of root barrier; tree root pruning, preparing the walkway subgrade; concrete and subgrade material testing; protection of work; loam and seed areas; and construction of concrete walkways and ADA accessible ramps areas throughout the development.
|
|
U N S P S C Code:
|
72-13-00
General building construction
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.