| Location: | South Carolina |
|---|---|
| Posted: | Oct 9, 2025 |
| Due: | Nov 6, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 1913.24001 |
| Publication URL: | To access bid details, please log in. |
The project is generally described as a complete demolition of the exisiting site in preparation of a new wellness center and other associated facilities. The site is located at the intersection Hazel Street, and Highway 121. Work includes but is not limited to: demolition of existing buildings, tennis courts, pool, pavement, existing utilities as well as clearing and grubbing, site grading, erosion control and the installation of stormwater management structures.

With GovernmentContracts, you can:
...and erosion control measures. Pre-Bid Information: Optional Pre-Bid Meeting held at Lower Reedy ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/28/2026
...* Installation of erosion and sedimentation control facilities A non-mandatory pre-bid conference will ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...and wood habitat and stabilization structures, erosion and sediment control measures, and establishment...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026
...sidewalks, and concrete curb and gutter; installation of temporary and permanent erosion control..., ...
City of Charleston
Bid Due: 8/07/2026