The Work includes the following major items:
a. Installation of approximately 11,040 linear feet of 24-inch ductile iron
water transmission main. Refer to Specification 01640 for materials
supplied by Owner.
b. Two Stream Crossings of Bobbin Mill Brook on North River Road and
Stetson Road in Auburn, which include installation of 24” Ductile Iron
pipe in a 32” steel sleeve. Refer to Specification 01640 for materials
supplied by Owner.
c. Cross country water main installation.
d. Interconnections with the existing 24-inch cast iron water transmission
main on Center Street and Stetson Road.
e. Approximately 13,500 linear feet of (2) 4-inch Fiber Optic conduit and
associated Fiber Optic handholes.
1) Work within the intersection of Turner Street, Center Street, and
Union Street shall be completed with night work.
f. Installation of blow-off assemblies, air release piping and manholes,
combination air valve manholes, and permanent air vents.
g. Pavement repairs, surface restoration, and appurtenant work.