| Location: | Pennsylvania |
|---|---|
| Posted: | Jun 18, 2026 |
| Due: | Jul 20, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | County of Bucks, PA |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work to be completed under this contract includes all labor, equipment and materials to
construct stormwater management improvements associated with the previously installed
gravel parking expansion including inlets, pipe, and fencing as shown on the Drawings and
described in the Project Manual. The Work also includes soil erosion and sedimentation
control measures, pedestrian and vehicular traffic control, and restoration.

With GovernmentContracts, you can:
...erosion control, demolition, grading, soil compaction, trash/material removal, and local permitting...
PennBid
Bid Due: 8/13/2026
...of modified Bio-Retention soil mix, installation of one (1) Bio-Retention Stormwater Control Measure, ...
PennBid
Bid Due: 8/03/2026
...monomers, chemicals, or contaminants into groundwater, soil, or nearby waterways. • The process...
State Government of Pennsylvania
Bid Due: 7/28/2026
...of the district forester to prevent soil erosion and sedimentation during the operation ...
State Government of Pennsylvania
Bid Due: 8/07/2026