Sunset Nature Lodge HVAC Replacement

Location: Missouri
Posted: Jun 18, 2026
Due: Jul 16, 2026
Agency: City of Florissant
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 25-0260-PR
Publication URL: To access bid details, please log in.


Project ID: 25-0260-PR

Title: Sunset Nature Lodge HVAC Replacement

Addenda: 0

Release Date: 6/18/2026

Due Date: 7/16/2026

Follow
Sunset Nature Lodge HVAC Replacement
Invitation For Bid
Parks and Recreation
22133 , 23822 , 238220 , 33341 , 333415 ... show all
Project ID: 25-0260-PR
Release Date: Thursday, June 18, 2026
· Due Date: Thursday, July 16, 2026 10:00am
Posted Thursday, June 18, 2026 4:30pm
All dates & times in Central Time
Draft Response Events RSVP No Bid27 days, 13 hours, 47 minutes


Post Information

Posted At:Thu, Jun 18, 2026 4:30 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

General work description: The City of Florissant is soliciting sealed bids from qualified HVAC contractors to furnish all labor, materials, equipment, permits, supervision, and incidentals necessary to remove and replace three (3) existing HVAC split systems at Sunset Nature Lodge.

The replacement units shall be Sure Comfort Vantix™ Line Side-Discharge Universal Heat Pumps, Model RD18AY Series, matched with compatible inverter-driven air handling equipment and electric backup heat as specified herein.

See Exhibit A in attachments for detailed specs.

No substitutions, alternates, equals, or approved equivalents will be accepted.

Project Location:
Sunset Nature Lodge
2300 Sunset Park Drive
Florissant, Missouri 63031

Scope of Work

The successful contractor shall provide all labor, materials, equipment, tools, transportation, and supervision necessary to complete the following:

Demolition and Removal

  1. Disconnect and remove three (3) existing HVAC split systems currently serving Sunset Nature Lodge.
  2. Recover refrigerant in accordance with EPA regulations.
  3. Remove and legally dispose of all existing condensers, air handlers, refrigerant piping, controls, and related components designated for replacement.
  4. Protect existing building finishes and adjacent facilities during removal operations.

New Equipment Installation

Provide and install:

  • Three (3) Sure Comfort Vantix™ Line Side-Discharge Universal Heat Pumps
    • Model Series: RD18AY
    • Capacity: 5 Ton (or size matching existing load requirements)
    • Efficiency:
      • Cooling Efficiencies up to 19 SEER2/13 EER2
      • Heating Efficiencies up to 10 HSPF2
    • Refrigerant: R-454B
    • Inverter-driven variable speed compressor technology
  • Three (3) matching compatible inverter air handlers with:
    • Variable-speed blower motors
    • Electric backup heat packages
    • Factory-approved communicating controls

Refrigerant Piping

  1. Inspect existing refrigerant line sets.
  2. Flush and clean reusable line sets using approved refrigerant line flushing procedures.
  3. Replace any damaged or unsuitable piping as required.
  4. Pressure test all refrigerant piping systems.
  5. Evacuate systems to manufacturer-required vacuum levels before charging.

Electrical Work

  1. Reconnect existing electrical services to new equipment.
  2. Install new disconnects, whips, breakers, and electrical components as required for code compliance.
  3. Coordinate all electrical modifications necessary for proper operation of the new equipment.
  4. Verify compatibility of existing electrical service with installed equipment.

Ductwork Modifications

  1. Modify and reconnect existing supply and return ductwork as required.
  2. Seal all duct connections.
  3. Ensure proper airflow and system balancing throughout the facility.

Controls and Commissioning

  1. Install manufacturer-approved thermostats and control interfaces.
  2. Program and configure all equipment controls.
  3. Start up and commission each HVAC system in accordance with manufacturer requirements.
  4. Verify proper heating, cooling, airflow, and control operation.
  5. Provide written startup and commissioning reports.

Testing and Balancing

  1. Verify system performance and operating pressures.
  2. Confirm proper refrigerant charge.
  3. Test heating and cooling modes.
  4. Balance airflow as required for proper operation.

Contractor Requirements

The contractor shall:

  • Be licensed to perform HVAC work in the State of Missouri.
  • Maintain all required insurance coverage.
  • Comply with all applicable federal, state, and local codes.
  • Obtain all permits required for the work.
  • Coordinate work with City staff to minimize disruption to facility operations.
  • Remove all debris daily and maintain a clean work site.

Warranty Requirements

Contractor shall provide:

  • Manufacturer's standard equipment warranty.
  • Minimum one (1) year warranty on workmanship and installation.
  • Warranty documentation shall be provided at project closeout.
  • Provide pricing for additional (1) year maintenance contract

Closeout Documents

Upon completion, contractor shall provide:

  • Equipment manuals.
  • Warranty certificates.
  • Startup and commissioning reports.
  • As-built documentation identifying equipment installed.
  • Recommended maintenance schedule.


Timeline

Release Project Date:
June 18, 2026
Pre-Bid Meeting (Non-Mandatory):
June 25, 2026, 10:00am
2300 Sunset Park Dr, Florissant, MO 63031
Question Submission Deadline:
July 14, 2026, 5:00pm
Question Response Deadline:
July 15, 2026, 5:00pm
Submission Deadline:
July 16, 2026, 10:00am
Zoom: 6a7iMe
Passcode: https://us04web.zoom.us/j/72145592654?pwd=CVcybztLSpaXRt59JQXPH49h950gqa.1
Session will begin at 10 am and continue until prices for all bidders have been read.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bridge Demolition RFP) Issue Date & Time 5/7/2026 09:00:01 AM (CT) Close Date ...

Lincoln County

Bid Due: 7/28/2026

...Caldwell 7/9 S Main Demolition - Caldwell, KS StatusAccepting Bids Prebid Date 7/8/26 ...

Drexel Technologies

Bid Due: 8/10/2026

...Caldwell 7/9 S Main Demolition - Caldwell, KS StatusAccepting Bids Prebid Date 7/8/26 ...

Drexel Technologies

Bid Due: 8/10/2026

...Caldwell 7/9 S Main Demolition - Caldwell, KS StatusAccepting Bids Prebid Date 7/8/26 ...

Drexel Technologies

Bid Due: 8/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.