| Location: | Colorado |
|---|---|
| Posted: | Apr 2, 2025 |
| Due: | May 6, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1282B125R0020 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
COLUMBINE OFFICE PAINTING PROJECT: SAN JUAN NATIONAL FOREST, COLORADO
********See the SOW, Attachment 1, for details on the SITE VISIT scheduled or April 8, 2025.**********
The work in this contract consists of the general construction of providing all the materials, labor, and equipment necessary to conduct surface repair, preparation, priming, and painting/staining of all previously painted or stained exterior surfaces at the Columbine District Ranger Site. In addition, all stair treads are to be replaced at the Bayfield Modular Office Building. Lastly, the columns holding the gabled overhand above the front deck of the Columbine District Ranger Office are to be replaced. The buildings to be painted are Columbine Ranger District Office, Bayfield Office #2, Bayfield Office #3, Bayfield Warehouse/Garage, Bayfield Modular Office, Bayfield Fire Cache/Tack Storage. The contractor will also be required to remove, store, and reinstall any exterior items that may impede required work. These items may include but is not limited to exterior lighting, mirrors, signs, air conditioning units, water hoses, and electrical boxes. An on-site interior storage area shall be designated by the COR prior to equipment removal. All plants are to be protected using an appropriate cloth and any required trimming shall be conducted by the contractor after receiving COR approval. All other landscaping shall be protected by a painter’s drop cloth. The work in this contract consists of the general construction of providing all the materials, labor, and equipment necessary to conduct surface repair, preparation, priming, and painting/staining of all previously painted or stained exterior surfaces at the Columbine District Ranger Site. In addition, all stair treads are to be replaced at the Bayfield Modular Office Building. Lastly, the columns holding the gabled overhand above the front deck of the Columbine District Ranger Office are to be replaced. The buildings to be painted are Columbine Ranger District Office, Bayfield Office #2, Bayfield Office #3, Bayfield Warehouse/Garage, Bayfield Modular Office, Bayfield Fire Cache/Tack Storage. The contractor will also be required to remove, store, and reinstall any exterior items that may impede required work. These items may include but is not limited to exterior lighting, mirrors, signs, air conditioning units, water hoses, and electrical boxes. An on-site interior storage area shall be designated by the COR prior to equipment removal. All plants are to be protected using an appropriate cloth and any required trimming shall be conducted by the contractor after receiving COR approval. All other landscaping shall be protected by a painter’s drop cloth.
| Apr 16, 2025 | [Solicitation (Updated)] COLUMBINE OFFICE PAINTING |

With GovernmentContracts, you can:
Description: DOWC Online Module Creation Department: CDLE - Division of Workers' Compensation Buyer:
State Government of Colorado
Bid Due: 6/30/2026
Follow USAFA Rapid Acquisition Commercial Solutions Opening (CSO) Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 5/29/2030
Description Opening Date/Time Closing Date/Time Request For Proposals Rail Station Area Plan May
City of Craig
Bid Due: 6/16/2026
Follow Bear Creek Service & Emergency Gates Replacement Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 6/08/2026