| Location: | Florida |
|---|---|
| Posted: | Nov 23, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | State Government of Florida |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB-14441 |
| Publication URL: | To access bid details, please log in. |
| Code | Description |
| 30122000 | Specialized external flooring and paving materials |
| 30131518 | Concrete block for bridges |
| 30161700 | Flooring |
| 30161702 | Wood flooring |
| 30161712 | Flooring joists |
| 72111004 | Patio and deck construction and repair service |
| 72141107 | Bridge construction and repair service |
| 72141129 | Park and garden construction and or remodelling service |
| 72141507 | Pile driving service |
| 72141510 | Demolition services |
| 72152705 | Sidewalk or ramp construction service |
| 72152710 | Foundation and footing construction service |
November 21, 2025
NOTICE TO APPLICANTS
ADDENDUM NO. ONE (1)
O’Leno State Park – Boardwalk Replacement
DEP BID NO. BDC09-25/26
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Laurinda Micheels, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.
_______________________________________
Signature of Contractor and Date
The following statements supersede & supplement the corresponding items in the specifications & drawings:
1. Question: Is there more information about the piles? I do see 2 7/8” with a 10/12 design but I did not see an actual count. Are there only 12? How deep is the estimated depth?
Answer: The total number of piles indicated in the plans is twelve (12). With respect to the depth of the piles, due to the limited soil information the actual depth required to achieve the design compression load of 8 kips is unknown; however, based on work performed on a previous project, we anticipate the load can be achieved with piles embedded into the soil 20 ft and less. Ultimately, the installed length to achieve the required capacity will be the responsibility of the contractor.
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.
Please direct all questions to:| Description | Date/Time |
| Addendum 1 BDC09-25/26 O’Leno State Park – Boardwalk Replacement | Nov 22, 2025, 12:55:10 AM |

With GovernmentContracts, you can:
...Project ID: Title: Soil Stabilization Pressure Grouting at 3814 Winderlakes Drive/Florida's... Turnpike Addenda: ...
City of Orlando
Bid Due: 10/15/2026
.... Commodity Codes Code Title 11111500 Dirt and soil 30121900 Soil stabilizers and ...
State Government of Florida
Bid Due: 10/06/2026
...Title 70131600 Land and soil preparation 70151500 Forestry management Contact Information Name Xavier...
State Government of Florida
Bid Due: 10/17/2026
...the City's water reclamation facility. The excavated soils from the restored wetland footprint...
City of Plant City
Bid Due: 10/08/2026