| Location: | Florida |
|---|---|
| Posted: | Nov 23, 2025 |
| Due: | Dec 16, 2025 |
| Agency: | State Government of Florida |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP-14438 |
| Publication URL: | To access bid details, please log in. |
| Code | Description |
| 72141126 | Underground utilities construction service |
| 72141510 | Demolition services |
| 72152702 | Grouting service |
| 83101500 | Water and sewer utilities |
Link to Solicitation Here;
https://vendors.planetbids.com/portal/62171/bo/bo-detail/135139
The Mandatory Pre-Bid/Site Visit Meeting will take place on Wednesday, December 3, 2025, at 10:00 A.M EST meeting at the following address:
Central Energy Plant
Atlantis Conference Room
5300 N. Center Drive, Lake Buena Vista, Florida 32830
All attendees must RSVP through PlanetBids by 12/02/2025 at 12:00 p.m to attend the Mandatory Site Visit. Contact information is required for each person attending the site visit.
After reservation, an email will be provided with access and the address for the site visit taking place after the initial presentation. PPE Is required for the site visit.
The Central Florida Tourism Oversight District (herein after “District”, “Owner” and “CFTOD”) is a Special Taxing District that serves as a local government entity. The District is responsible for its public infrastructure including, but not limited to roads, bridges, and water control system
The Central Florida Tourism Oversight District (“District” or "CFTOD") requests proposals from experienced and qualified firms to permanently abandon the remaining sections of the High Temperature Hot Water (HTHW) hotel loop that services the Magic Kingdom Resort Area.
The project will require the abandonment, sealing and/or removal of all indicated piping and the restoration of any affected property in compliance with Reedy Creek Engineering Services (RCES)/Central Florida Tourism Oversight District (CFTOD)/Walt Disney World (WDW) requirements.
It is the responsibility of the Contractor to verify the “As-Found” conditions and identify and provide any additional information required to complete the project. Additionally, it is the Contractor's responsibility to provide the means and methods of construction along with a comprehensive project schedule.
You must be a registered bidder through PlanetBids™ to obtain the supporting attachments to this project. We look forward to your participation.
Please direct all questions to:
| Description | Date/Time |
| C006979 MFMP Bid Flyer | Nov 21, 2025, 11:07:23 PM |

With GovernmentContracts, you can:
...Date/Time MFMP BID FLYER May 28, 2026, 10:08:49 PM For questions on a ...
State Government of Florida
Bid Due: 6/18/2026
...Lake Buena Vista, FL 32837 Email: krodrigues@oversightdistrict.org Description Date/Time Bid Flyer...
State Government of Florida
Bid Due: 6/06/2026
.../Time MFMP FLYER May 28, 2026, 10:19:46 PM For questions on a specific ...
State Government of Florida
Bid Due: 6/19/2026
...Lake Buena Vista, FL 32830 Email: smedina@oversightdistrict.org Description Date/Time MFMP BID FLYER...
State Government of Florida
Bid Due: 6/12/2026