| Location: | Connecticut |
|---|---|
| Posted: | May 30, 2025 |
| Due: | Jun 25, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP 8492- Wtby |
| Publication URL: | To access bid details, please log in. |
This Request for Proposal scope of work includes the following major elements: 1. Remove the existing ballast stone and membrane roofing system at the Primary Pump Station and over the Electrical and Control rooms at the Blower Building and install a new TPO roofing system. 2. Remove the existing membrane roofing system at the Sludge Processing Building and Maintenance Building and install a new TPO roofing system.
Maureen McCauley 235 Grand Street, Room 103 City of Waterbury CT, 06702 United States Tel: 2035746748 Fax: mmccauley@waterburyct.org

With GovernmentContracts, you can:
...Dredging and Dewatering of Sludge Norwich Public Utilities is issuing the following Request... ...
State Government of Connecticut
Bid Due: 7/29/2026
...Project: Dredging and Dewatering of sludge Ref. #: 27-02 Type: IFB Status: Open ...
City of Norwich
Bid Due: 8/05/2026
...Project: Dredging and Dewatering of sludge Ref. #: 27-02 Type: IFB Status: Open ...
City of Norwich
Bid Due: 7/29/2026
..., hazardous wastes and sludge samples; * acute and chronic toxicity studies for ...
State Government of Connecticut
Bid Due: 8/04/2026