Location: | Michigan |
---|---|
Posted: | Nov 29, 2024 |
Due: | Dec 18, 2024 |
Agency: | Grosse Ile township |
Type of Government: | State & Local |
Category: |
|
Publication URL: | To access bid details, please log in. |
Invitation to bid
NOTICE IS HEREBY GIVEN that the Township of Grosse Ile , Grosse Ile , Michigan is
accepting a lump sum sealed bid for;
“REPLACEMENT OF SHINGLE ROOF ON (1) Pump House”
No pre-bid meeting will take place. Interested parties can visit the building (work location) located at 9331 Bridge Road, anytime between the date of this notice an the submittal of their bid.
Sealed bids will be received until 2:00 p.m. on December 18, 2024 at the Clerk’s Office, Grosse Ile Township Hall, 9601 Groh Rd. , Grosse Ile , Mi. 48138. An original and
one (1) copy of the bid, including all documents and needed statements, shall be placed in a
sealed envelope, and marked “REPLACEMENT OF SHINGLE ROOF ON (1)
PUMP HOUSE”. Bids will then be opened the same day and read aloud at 2:00 p.m. in the aforementioned Clerk’s Office..
Intent
The Township of Grosse Ile seeks a qualified contractor to perform shingle removal, shingle
disposal and new shingle installation on (1) Pump House located at 9331 Bridge Rd.. Contractors submitting proposals shall include (3) projects of similar nature previously completed with owner contacts along with their bid proposal.
Bid documents can be obtained from the administration office located at 9601 Groh Rd.
, MI. 48138 or online at www.grosseile.com , under “Bid Opportunities” tab. Questions are to be directed to the Grosse Ile Township DPS Department at 734-676-4422 x228. Grosse Ile Township reserves the right to accept or reject any or all bids and to waive any or all
irregularities in Proposals. Proposals shall remain firm for forty-five (45) days from date of Bid
Opening.
BID DOCUMENT - Grosse Ile Township Pump House
The Project Bid Documents consist of:
• Bid Invitation, Bid Document and the Bid Form
General Information and Requirements
1. Prospective firms warrant by virtue of submission of bids that all prices, terms and
conditions stated will be honored for a period of forty-five days after the opening of bids.
2. The selected firm may not discriminate against any employee employed in the
performance of services, or against any applicant for employment because of race, sex
religion, color, sexual orientation, handicap, national origin, age, gender, or marital status.
Evaluation of Bids
The sealed bids shall be evaluated on the basis of price, prior history of service and capability
from all bidders deemed qualified to perform the work. The Township shall evaluate and analyze
all, and select the bid that, in the Township’s sole and final judgment, represents the best fiscal and overall solution for the Township. The Township reserves the right to seek clarification from
prospective firms on any issue in the bid or take any other action it feels necessary to properly
evaluate the bids and construct a solution in the Township’s best interest.
Payment
The project will be paid as a lump sum upon completion of the project and approval of the
owner.
Scope of work, Specifications and Other Requirements
Scope of Work
1. Remove and dispose of existing shingles, drip edge and felt to expose the existing wood
roof surface.
2. Repair any rotted or otherwise dangerous roof boards. Alternate #1 has a location to list
the square foot cost for roof board replacement.
3. Cap and seal any abandoned roof penetrations.
4. Install a minimum of one row of ice and water shield on the eaves. The buildings are not
heated.
5. Install new shingle vent to approximately 5’of each end of the buildings peaks.
6. Provide complete clean up and removal of all job-related debris including nails.
7. Provide the manufacturer’s warranty to owner.
Permits and codes
All construction shall meet all federal, state and local codes and requirements. All permits shall
be included.
Waste disposal
1. General contractor shall supply his own dumpster and is responsible for proper disposal
of waste generated by the project. No scattered or wind-blown construction debris will
be allowed. Contractor shall supply proof of legal disposal of all removed shingle waste
prior to owner payment.
Fall protection
Contractor shall follow all state and local codes pertaining to fall protection. Contractor shall
have a tool box meeting at the site prior to start of project reviewing fall protection.
Insurance
The contractor, and any and all of their subcontractors, shall not commence work under this
contract until they have obtained the insurance required under this paragraph. All coverage shall
be with insurance companies licensed and admitted to do business in the State of Michigan. All
coverages shall be with insurance carriers acceptable to Grosse Ile Township.
1. Workers’ Compensation Insurance: The Contractor shall procure and maintain
during the life of this contract, Worker’s Compensation Insurance, including
Employer’s Liability Coverage, in accordance with all applicable statutes of the State
of Michigan.
2. Commercial General Liability Insurance: The Contractor shall procure and
maintain during the life of this contract, Commercial General Liability Insurance on
an “Occurrence Basis” with limits of liability not less than $1,000,000 per occurrence
and aggregate combined single limit of $2,000,000, Personal Injury, Bodily Injury,
and Property Damage. Coverage shall include the following extensions: (A)
Contractual Liability; (B) Products and Completed Operations; (C) Independent
Contractors Coverage; (D) Broad Form General Liability Extensions or equivalent;
(E) Deletion of all Explosion, Collapse, and Underground (XCU) Exclusions, if
applicable.
3. Motor Vehicle Liability: The Contractor shall procure and maintain during the life
of this contract Motor Vehicle Liability Insurance, including Michigan No-Fault
Coverage’s, with limits of liability not less than $1,000,000 per occurrence combined
single limit, Bodily Injury, and Property Damage. Coverage shall include all owned
vehicles, all non-owned vehicles, and all hired vehicles.
4. Additional Insured: Commercial General Liability and Motor Vehicle Liability
Insurance, as described above, shall include an endorsement stating that the following
shall be Additional Insured’s and worded as follows: Grosse Ile Township, all elected
and appointed officials, all employees and volunteers, all boards, commissions, and/or
authorities and board members, including employees and volunteers thereof.
5. Cancellation Notice: Workers’ Compensation Insurance, Commercial General
Liability Insurance, and Motor Vehicle Liability Insurance, as described above, shall
include an endorsement stating the following: “It is understood and agreed that Thirty
(30) days Advance Written Notice of Cancellation, Non-Renewal, Reduction, and/or
Material Change shall be sent to: Grosse Ile Township Clerks Office - 9601 Groh Rd. Grosse Ile MI 48138.
6. Proof of Insurance Coverage: The Contractor shall provide Grosse Ile Township at
the time that the contracts are returned by him/her for execution, Certificates of
Insurance as well as the required endorsements. Copies of all policies mentioned
above shall be furnished, if so requested.
7. Expiration of Coverage: If any of the above coverages expires during the term of
this contract, the Contractor shall deliver renewal certificates and/or policies to the
Township at least ten (10) days prior to the expiration date.
SPECIFICATION SECTION- SHINGLES
GENERAL
SUMMARY
Remove and properly dispose of existing shingles and provide new shingles and accessories
for roofing applications.
SUBMITTALS
Product Data: Submit manufacturer's product data indicating material characteristics, and
installation instructions for each material and product used.
Samples: Not required unless substitutions are requested.
Warranty: Submit manufacturer’s lifetime transferable warranty against manufacturing
defects on commercial applications. Fifteen year “Streak Fighter” algae-resistance
warranty. Ten year Sure Start protection. Fifteen-year 110 mph wind resistance
warranty.
Contractor shall warrant his installation workmanship work for a period of one year.
QUALITY ASSURANCE
Comply with governing codes and regulations. Use experienced installers. Deliver, handle,
and store materials in accordance with manufacturer's instructions.
MATERIALS
Asphalt Shingles:
Manufacturers: CertainTeed Roofing Products or approved equal.
Type: “Landmark Pro” by CertainTeed. Dimensional, two-piece laminated fiber glass based
construction, algae resistant, 250 lbs. per square U.L. Class A fire resistance
certified to meet ASTM D3018 Type 1, U.L. certified to meet ASTM D3018 Type-
1 and ASTM D3161 Class-F wind resistance.
Color: To be selected by Grosse Ile Township
Ridge Vent: “Shingle Vent II” by Air Vent or approved equal. Ridge vent shall include
the following: one-piece, durable high-density co-polymer, with built in baffle to
deflect wind, 18” square inches of ventilation per linear feet, and internal filter.
Accessories:
Ridge cap: Shingles to match
Underlayment: #15 felt, ASTM D 226 or approved equal.
Pre-manufactured electric mast flashing
Waterproofing underlayment: self-adhering sheet underlayment, polyethylene
surfaced: ASTM D 1970 perimeter underlayment. Ice and Water Shield,
“Winter Guard”, or approved equal.
Nails: standard round wire type roofing nails, corrosion resistant, hot dipped zinc
coated steel, aluminum, or chromated steel, minimum 3/8” head diameter,
shank to be sufficient length to penetrate through roof sheathing or ¾” into
solid wood or plywood.
Asphalt roofing cement: ASTM D 4586, Type I or II
Pre-finished drip edge. Color to be selected by Grosse Ile Township
Sheet Flashing: ASTM A 361/A 361M; 26-gauge steel with minimum G115/Z350
galvanized coating.
Starter strip shingles
Use CertainTeed brand starter shingles.
EXECUTION
ROOF DECK PREPARATION
Remove all existing shingle, flashings, trim and properly dispose of them off site. Broom
clean deck surfaces under eave protection and underlayment prior to their application.
Clean substrate of any projections and substances detrimental to shingle work. Cover
knotholes and other minor voids in substrate with sheet metal flashing secured with
roofing nails.
Replace rotted or otherwise defective roof boards as per the alternate #1 price per square foot
listed on the bid form
Verify that the roof penetrations and plumbing stacks are in place and flashed to deck
surface.
INSTALLATION
Comply with recommendations of NRCA Steep Roofing Manual.
Install materials and systems in accordance with manufacturer's instructions and approved
submittals. Follow manufactures instructions for proper layout/installation of shingles.
The building is unheated. Install a minimum of one row of ice and water underlayment
along the eve or more if required by code, but a minimum of one row is to be installed.
Apply one layer of felt horizontally over entire surface, lapping succeeding courses and
fastening with sufficient nails to hold in place until shingle application.
Cut a 1” clear ridge vent opening in the roof deck on each side of ridge (2” total). Do not
over cut the trusses. Install ridge vent in accordance with manufacturers’ instructions.
Properly flash and seal roof penetrations.
Make sure there is ½” of shingle overhanging the rakes and eaves drip edge or per
manufacturers guidelines.
THE TOWNSHIP OF GROSSE ILE - GROSSE ILE , MICHIGAN
BID PROPOSAL
Submitted On: ______________________________
To the Township of Grosse Ile (hereafter Township or Owner):
The undersigned, as bidder hereby declares that the only person or persons interested in the
Proposal as principal or principals, is or are named herein and that no other person that herein is
mentioned has any interest in this Proposal or in the Contract to be entered into; that this
Proposal is made without any connection with any other person, company or parties making a
Bid or Proposal: and that it is, in all respects, fair and in good faith, without collusion or fraud.
The Bidder further declares that he has examined the site and informed himself fully in regard to
all conditions pertaining to the place where work is to be done: that he has examined the Plans
and Specifications for work and Contractual documents relative thereto; and has read all special
provisions furnished prior to the opening of bids is any; that he has satisfied himself relative to
work to be performed.
The Bidder proposes and agrees, if this Proposal is accepted, to contract with the Township of
Grosse Ile , to furnish all necessary materials, equipment, machinery, tools, apparatus, means
of transportation, bond (if required), permits, taxes and labor necessary to complete the work
known particularly as:
Name of project:
“REPLACEMENT OF SHINGLE ROOFS ON (1) Pump House”
Respectfully submitted by,
Name of Firm
________________________________________________________________________
________________________________________________________________________
Address (Post Office Box, Street, City, State and Zip Code)
________________________________________________________________________
State of Incorporation or Sole Proprietorship
________________________________________________________________________
Signature of Authorized Corporate Officer, Partner or Proprietor
________________________________________________________________________
Title
________________________________________________________________________
Name of Bidder
BID PROPOSAL
“REPLACEMENT OF SHINGLE ROOFS ON (1) Pump House”
Company name: __________________________________________________________
Company address: ________________________________________________________
City: _______________________________State: ___________Zip_________________
Phone (____) _____-________ Fax: (____) _____-_________E-mail________________
The following bid is in strict accordance with the Township of Grosse Ile ’s Invitation to bid and
all attachments as referenced herein.
Lump sum base bid (Written Amount)
______________________________________________________________________________
____________________________________________________________Dollars
$___________________________and________/100’s
*Addendum acknowledged, if any: #_______Date______________.
*Estimated completion time in calendar days from award date: _____________________.
*Alternate #1
Unit cost per square foot for removal, disposal and replacement of roof boards
$____________________/ square foot
Signature of bidder Date
___________________________________________ _____________________
Printed Name of Bidder
_______________________________________________
With GovernmentContracts, you can:
Description: Request for quote Department: Military and Veterans Affairs Buyer: GREGORY PAWLAK Solicitation
State of Michigan
Bid Due: 5/19/2025
Description: Elementary K-5 Curriculum Department: Saranac Community Schools Buyer: Andy Nurenberg Solicitation Number:
State of Michigan
Bid Due: 5/22/2025
Description: Athletic Field Construction - Baseball & Softball Complex Department: Manton Consolidated Schools
State of Michigan
Bid Due: 5/15/2025
Description: 761/22093.KSZ; McDonalds Country Store Soil Excavation Department: Technology, Management and Budget Buyer:
State of Michigan
Bid Due: 5/14/2025