| Location: | Hawaii |
|---|---|
| Posted: | Mar 17, 2026 |
| Due: | Apr 8, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The scope of work consists of the asphalt concrete pavement reconstruction of Taxiway C and PCC pavement reconstruction adjacent to Hardstands A-E on the South Ramp, including asphalt overlay, storm drain replacements and repairs, 12-inch waterline replacement, and airfield electrical and lighting revisions.
Due to the large file size, the FINAL PLANS AO1021 30 Part 1 of 2.pdf can be downloaded using this link: https://hiepro.ehawaii.gov/solicitation-notice.html?rfid=26001663
NOTE: To download ADDENDUM 1, please use the following link: https://hiepro.ehawaii.gov/solicitation-notice.html?rfid=26001663
| Download |
|
Plans
Specifications
|
Addendums/Amendments
|

With GovernmentContracts, you can:
...HARBOR CONCRETE ROADWAY REPAIR WORK [BID DATE CHANGED FROM 5/29/2026, 6/5/2026] details view ...
General Contractors Association
Bid Due: 6/10/2026
...Bid Date: 2026-06-16 Project Description: The work for this project will construct (design-bid..., ...
General Contractors Association
Bid Due: 6/16/2026
...of the concrete culverts drainpipes. the major elements of the scope of work ...
DEPT OF DEFENSE
Bid Due: 6/30/2026
...of the concrete culverts drainpipes. the major elements of the scope of work ...
DEPT OF DEFENSE
Bid Due: 7/30/2026