| Location: | New Mexico |
|---|---|
| Posted: | Aug 12, 2026 |
| Due: | Aug 19, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA9401-26-Q-0035 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
*See all attachments for complete details *
Provide a self-contained, battery-operated capability to move trailers up to 30,000 lbs in confined operational footprints. Eliminate the necessity for CDL-certified drivers to perform routine yard shunting. Reduce localized carbon emissions and noise pollution at the loading dock via the 48-volt electric system.
Key features and specifications of the Terminal Tractor include:
• Capacity: 30,000 lbs
• Power: 48V system with a 48V Lithium Battery Option (8 Batteries)
• Frame: Heavy Duty Steel Frame
• Control: AC Digital Controller with adjustable acceleration/braking, neutral throttle braking, and a variable speed twist grip.
• Speed: 0-1.6 mph (Forward/Reverse)
• Lift: 10" Hydraulic Pump Lift Kit
• Wheels: 10" wide x 18" diameter steer wheel and a 10" wide x 18" diameter solid drive tire.
• Safety Features: Includes a safety stop switch, safety horn, safety strobe flashing light, and an air release system with a tank.
• Additional Options: The quote also includes a pintle hitch assembly, a tall king pin, a king pin lighting kit, and a footpath lighting kit.

With GovernmentContracts, you can:
...of the carbon steel. The mechanical system is beyond repair, so this equipment ...
City of Santa Fe
Bid Due: 9/30/2026
...is secured between steel plates that compress the quartz chips and ETFE gaskets ...
ENERGY, DEPARTMENT OF
Bid Due: 9/30/2026
...protection limitations identified in prior use. The M-Resistor design replaces a steel enclosure...
ENERGY, DEPARTMENT OF
Bid Due: 12/08/2026
...and Chemicals (hydrogen production for refining, ammonia, steel) Aerospace and Defense (unmanned systems...
ENERGY, DEPARTMENT OF
Bid Due: 1/06/2027