Project Description: The estimated construction cost for the Project is approximately $2.5 million. The WORK will include the following:
• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry.
• Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure.
• Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.

With GovernmentContracts, you can:
...Project: Natural Surface Trail Construction Ref. #: DF26-34 Department: COUNTIES - Tooele County... ...
State Government of Utah
Bid Due: 10/09/2026
...Project: RFP - Construction Manager/General Contractor for Career Technical Center Ref. #: TB2718... ...
State Government of Utah
Bid Due: 10/22/2026
...Follow HAFB Multiple Award Construction Contract V (MACC V) Active Contract Opportunity Notice ...
DEPT OF DEFENSE
Bid Due: 12/09/2026
...Project: NS27-108 Kane County - Construction Services Remodel Projects Ref. #: NS27-108 Department... ...
State Government of Utah
Bid Due: 10/09/2026