| Location: | Utah |
|---|---|
| Posted: | Mar 15, 2026 |
| Due: | Apr 10, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 513800052 |
| Publication URL: | To access bid details, please log in. |
Project Description: The estimated construction cost for the Project is approximately $2.5 million. The WORK will include the following:
• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry.
• Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure.
• Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.

With GovernmentContracts, you can:
...Project: Construction Project Management Ref. #: SB26-6 Department: Division of Purchasing Type... to ...
State Government of Utah
Bid Due: 8/19/2026
...Project: PRE-APPROVED ADU CONSTRUCTION DOCUMENTS Ref. #: SUCO7172026 Department: COUNTIES - Summit... for ...
State Government of Utah
Bid Due: 8/21/2026
...Bid Title: Pre-Approved ADU Construction Documents Category: RFP Postings Status: Open Description...: Pre-Approve ...
Summit County
Bid Due: 8/21/2026
...Project: NSD Testing & Special Inspection of Construction Materials RFP Ref. #: NSDRP26-0708... ...
State Government of Utah
Bid Due: 8/11/2026