| Location: | Utah |
|---|---|
| Posted: | Mar 15, 2026 |
| Due: | Apr 10, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 513800052 |
| Publication URL: | To access bid details, please log in. |
Project Description: The estimated construction cost for the Project is approximately $2.5 million. The WORK will include the following:
• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry.
• Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure.
• Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.

With GovernmentContracts, you can:
...of epoxy lined and coated 20-inch steel pipe connection to a 42-inch JVWCD ...
State Government of Utah
Bid Due: 7/07/2026
...for supply and installation of two (2) above ground steel deck truck scale ...
State Government of Utah
Bid Due: 6/24/2026
...steel control structures with gates at turnout locations for water management. Work includes...
Franson Civil Engineers
Bid Due: 6/26/2026