| Location: | Utah |
|---|---|
| Posted: | Mar 15, 2026 |
| Due: | Apr 10, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 513800052 |
| Publication URL: | To access bid details, please log in. |
Project Description: The estimated construction cost for the Project is approximately $2.5 million. The WORK will include the following:
• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry.
• Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure.
• Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.

With GovernmentContracts, you can:
...Project: Consultant for JOC Construction Services Ref. #: SB26-12 Department: Division... into a ...
State Government of Utah
Bid Due: 11/19/2026
...Project: Construction: Taylorsville High School Addition Ref. #: DB27-011-RFP Department: SCHOOL... of this ...
State Government of Utah
Bid Due: 11/19/2026
...Project: Construction: New Building at West Kearns Elementary Site Ref. #: JF27-018-IFB Department... ...
State Government of Utah
Bid Due: 12/10/2026
...Haynes Well 8 well house construction project 2027 Advertisement for Bids General Notice ...
Magna Water District
Bid Due: 12/01/2026