Project Description: The estimated construction cost for the Project is approximately $2.5 million. The WORK will include the following:
• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry.
• Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure.
• Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.

With GovernmentContracts, you can:
...Project: DFCM Construction - Prequalified Electrical Stage II - Department of Workforce Services... ...
State Government of Utah
Bid Due: 6/16/2026
...structures, piping, and electrical systems. The site will be regraded using imported fill ...
State Government of Utah
Bid Due: 6/23/2026
..., by replacement, the Building Management System (BMS) in Dugway's Combined Chemical Test ...
DEPT OF DEFENSE
Bid Due: 6/08/2026
...the renovation, modernization, and phased replacement of plating shop facilities at Hill Air ...
DEPT OF DEFENSE
Bid Due: 6/11/2026