| Location: | Hawaii |
|---|---|
| Posted: | Jan 3, 2026 |
| Due: | Jan 22, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes roadway installation of temporary detour asphalt concrete paved road and temporary detour steel-truss bridge and abutments, temporary relocation of water main; demolition of bridge, abutments, columns, wing walls, and asphalt concrete pavement; and installation of replacement one-lane concrete bridge, abutments, columns, wing walls, concrete approach slab, asphalt concrete pavement, guardrails, pavement markings, signs, surface stabilization, permanent water main; and removal of temporary detour road, bridge, and water main, and restoration of disturbed areas.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
20251230 Addendum 2.pdf
|

With GovernmentContracts, you can: