| Location: | Utah |
|---|---|
| Posted: | Aug 12, 2026 |
| Due: | Sep 1, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-08 |
| Publication URL: | To access bid details, please log in. |
Project Description: The scope of this project is to provide all the labor, materials, tools, traffic control and equipment necessary to construct the Spitfire Storm Drain Improvement Project, complete as described in the plans and specifications. The project generally includes the following: to remove existing storm curb inlet, install new double grate storm drain inlet, connect the inlet to existing storm drain manhole with a HDPE pipe on the street, loop the culinary water main line, install air release assembly with a faux rock, remove and reinstall concrete path.

With GovernmentContracts, you can:
...description opening date closing date CC26-475 Main Water Tank Drainline Upgrade Project October ...
City of Riverton
Bid Due: 11/17/2026
...and install a new main water service line. The line will run from ...
State Government of Utah
Bid Due: 11/16/2026
...water service to new main line, installing 56 new water services, installing 33 ...
State Government of Utah
Bid Due: 11/19/2026
...(abandoned in place) with 4" HDPE water main and associated valves and connections ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2026