| Location: | Utah |
|---|---|
| Posted: | Aug 12, 2026 |
| Due: | Sep 1, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-08 |
| Publication URL: | To access bid details, please log in. |
Project Description: The scope of this project is to provide all the labor, materials, tools, traffic control and equipment necessary to construct the Spitfire Storm Drain Improvement Project, complete as described in the plans and specifications. The project generally includes the following: to remove existing storm curb inlet, install new double grate storm drain inlet, connect the inlet to existing storm drain manhole with a HDPE pipe on the street, loop the culinary water main line, install air release assembly with a faux rock, remove and reinstall concrete path.

With GovernmentContracts, you can:
...PROPOSALS from Construction Manager/General Contractor (CM/GC) firms to construct a new Fire Station ...
State Government of Utah
Bid Due: 9/16/2026
...as Reconstruction (4R) with one segment of restoration (3R), and will design and ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 9/23/2026
...and ensuring that PCJ and its contractors design and construct the Project on ...
State Government of Utah
Bid Due: 10/05/2026
...and ensuring that PCJ and its contractors design and construct the Project on ...
State Government of Utah
Bid Due: 10/09/2026