TOWN OF LITCHFIELD, CONNECTICUT
REQUEST FOR PROPOSALS
UPDATE OF PLAN OF CONSERVATION AND DEVELOPMENT (POCD)
The Town of Litchfield, CT is accepting proposals for the updating of the Town’s 2017
Plan of Conservation and Development. Proposals submitted must include the
consultants’ qualifications and a generalized scope of services to be provided. The
proposal will include the requisite documents, plans and maps required for compliance
with CGS Section 8-23. A major aspect of the process will include community meetings
that engage residents from all areas and demographic groups within the town. In
addition to knowledge of the Statutory requirements for the updating of the Plan,
interested consultants must have excellent communication skills in guiding discussions
with residents with the goal of achieving community consensus. The final document will
include recommendations in the areas of long-term community planning, environmental
management, economic development, conservation and recreation, culture and history,
transportation, housing, education and government. The selected consultant should be
well versed in State Statutes and all on-going legislative changes, particularly regarding
housing.
The current POCD is available for review on the Town of Litchfield Website at the
following link: https://www.townoflitchfieldct.gov/entities/land-use.
Scope of Services
The work program and final scope of the project, including deliverables, is anticipated to
be clarified once a consultant is selected, however, the project will include at least the
following components and any additional tasks necessary to meet the statutory
requirements:
a. Data update and Assessment: the updating of all relevant data including, but not
limited to, demographics, economic development, housing, land use,
transportation, town facilities, municipal infrastructure, and preservation of
historic and natural resources. Included is the updating of existing maps, tables
and graphs. The final product must be consistent with the Regional and State
POCDs.
1
b. Stakeholder Participatory Process: In combination with the PZC Steering
Committee, the consultant will create and manage an efficient and effective
stakeholder participation process within the project timeframe and budget. The
process shall employ effective methods that lead to consensus among agencies
and residents regarding long-term planning for the community.
c. Project Schedule and Management: It is anticipated the project will commence
immediately following consultant selection and contract execution. The
estimated completion date will be following POCD adoption and anticipated to be
no later than December 31, 2027.
GENERAL
The selected consultant must comply with all State and Federal affirmative action and
equal employment opportunity practices. The consultant shall obtain and maintain, at its
expense, Professional Liability Insurance at a minimum amount of $1,000,000. The
consultant shall obtain and maintain, at the consultant’s expense, such insurance as will
protect the consultant from claims under Workers’ Compensation and Comprehensive
General Liability Insurance that will protect the Town of Litchfield from all claims of
bodily injury, death or property damage which may arise from the performance by the
consultant or the consultant’s employees in their functions and services to the Town of
Litchfield. Limits of insurance shall be a minimum of $1,000,000 per occurrence,
$2,000,000 aggregate. Workers’ Compensation shall be in accordance with Connecticut
Statutes. The selected consultant shall, within five (5) days of award, provide proof of
this insurance. The Town of Litchfield shall be listed as a primary additional insured.
Final Selection
After review of the Proposals submitted, the Town may conduct consultant interviews
with the individuals it judges to be the most qualified to perform the required services.
The following factors will be used in the selection process:
• Technical expertise;
• Experience on similar projects;
• Qualifications and experience;
• Reputation of the consultant based on references;
• Ability to schedule the project within the time constraints; and
• Evaluation of the fee proposal.
2
The Town of Litchfield reserves the right to reject any and all proposals. It shall be
understood that the award made by the Town of Litchfield shall be final and conclusive
and without recourse or appeal by the remaining consultants. The successful consultant
will be expected to execute a standard contract for professional services as approved
by the Town of Litchfield.
SUBMITTAL DOCUMENTATION
Consultants shall submit a cover letter addressed to Steven Macary, Land Use
Administrator, signed by an authorized principal or agent of the firm, to include an
overview of the consultant’s proposal, as well as the name, title, phone number and
email address of the person to whom questions concerning the request for proposals
may be directed. Consultants will provide their resume showing qualifications for
Litchfield’s POCAD update.
Scope of Services
Provide a detailed Scope of Work which outlines various services to be provided for the
project. All services not specifically mentioned in the RFP, which are necessary to
ensure the State mandated scope of services are met, should be included in the
proposal.
Experience and Ability
Provide examples of previous work on similar projects to demonstrate the consultant’s
understanding and familiarity with projects of this type, including providing a list of any
POCD projects of Connecticut communities which have been completed in the last five
years.
Project Approach
Outline a proposed approach to the project, including information on community
outreach, consensus building and effective approaches to community planning. The
consultant should provide information on planning philosophy and proposed approach
to the development of Litchfield’s Plan of Conservation Development.
References
At minimum, a list of previous and/or current contracts which are similar to the
requested scope of services, including;
a) Dates of contract duration.
3
b) Services performed.
c) References including name, address, telephone numbers of clients which may be
contacted for verification of information submitted.
d) Statement as to whether the project was completed on time and within budget.
Fees
Consultant is requested to submit an estimated total cost for completion of the POCD
project as outlined in the RFP.
Submission Requirements
Include a description of all submittals required as requested in the RFP. The proposal
for the update of Litchfield’s POCAD should include four (4) copies submitted to: Mr.
Steven Macgary, Land Use Administrator, Town of Litchfield, 74 West Street, PO Box
488, Litchfield, CT 06759 along with one (1) electronic copy to
zoningadmin@townoflitchfieldct.gov no later than 2:00 pm on Friday, July 17, 2026.
Late proposals will not be considered. All costs incurred in the preparation and
presentation of the RFP shall be wholly absorbed by the respondent. Any material
submitted shall become the property of the Town of Litchfield and is available for review
under the Freedom of Information Act.
POINT OF CONTACT: Steven Macary, Land Use Administrator, 860-567-7565,
zoningadmin@townoflitchfieldct.gov.
4
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.