| Location: | Hawaii |
|---|---|
| Posted: | Dec 9, 2025 |
| Due: | Dec 14, 2025 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The Contractor shall provide all labor, tools, equipment, and materials to perform all work related to the removal of existing carpet and installation of Vinyl Composite Tile (VCT) in the main entrance room and (4) adjoining bedrooms. New cove base shall be installed in all rooms excluding the bathrooms. See details below regarding the requirements of this project. Additional information is provided on Attachment 2a.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
1 SOW YCA B1786 Rm 304 Carpet and Flooring Ammendment 1.pdf
|

With GovernmentContracts, you can:
..., including ceilings, flooring, walls, doors, painting, and lighting. Additionally, scope includes...
State Government of Hawaii
Bid Due: 8/14/2026