Lakeside High Roof Replacement HC-08-18-26 Addendum 1

Location: Georgia
Posted: Aug 11, 2026
Due: Aug 18, 2026
Agency: Columbia County School District
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
  • Lakeside High Roof Replacement HC-08-18-26 Addendum 1
  • Attachment Preview

    DATE:
    PROJECT:
    PROJECT NUMBER:
    ADDENDUM #1
    August 7, 2026
    2KM Architects, Inc.
    529 Greene Street
    Augusta, GA 30901
    ph. 706.736-3333
    fx. 706.736-7100
    Lakeside High School Roof Replacement
    533 Blue Ridge Dr.,
    Evans, GA 30809
    2KM 26-24.03
    Facility Code #636-0189
    Part 1 - Specifications:
    1.101
    Reference Section A - 00100 Invitation to Bid, fifth paragraph, Pre-Bid Conference.
    A. The following are made a part of the Contract Documents:
    1. See attached “Pre-bid Conference Agenda.”
    2. See attached “Sign-in Log” for attendance at Pre-bid Conference.
    3. See attached “Meeting Notes” from Pre-bid Conference.
    Part 2 Drawings:
    N/A
    Part 3 Questions and Answers:
    1.301 Question #1: Please confirm the General Contractor requirement at your earliest convenience.
    Response:
    The Owner prefers a General Contractors license for trade coordination.
    However, if a licensed roofing contract may submit a bid as long as the
    insurance and bonding capabilities are met in addition, a licensed electrical
    contractor, Mechanical and Plumbing Contractor must be listed on the bid. If
    this is not provided, the bid will be disallowed.
    1.302 Question #2: Could you tell me approximately how big the project is? How many squares and is it
    a full roof tear-off and replacement?
    Response:
    147,000 Sq Ft, not a complete tear-off but a KEE overlay with added insulation
    and coverboard.
    1.303 Question #3: Can Duro-Last 60-mil PVC Roofing Membrane be substituted roofing membrane?
    Response: No, the Owner prefers a KEE Roofing Membrane system.
    1.304 Question #4: If the manufacturer approves, can the insulation be placed in one layer of 2” ISO?
    Response:
    Yes, the basis of design manufacturer could only provide 1” thick insulation.
    The target R-value is R-11.4 to R-13 and that can be achieved by one layer of
    2” Poly-iso.
    1.305 Question #5: Is the insulation to be adhered to the existing roof or mechanically attached?
    Response: Fully adhered with low VOC adhesive, full coverage.
    26+-24.03 Lakeside High School Roof Replacement
    1
    Z:\Active_Projects\2026 Projects\26-24 CCSD\26-24.03 Lakeside HS Roof Replacement\ADMINISTRATION\(BD) Bid Documents\4 - Addenda\Addendum #1.doc
    ADDENDUM # 1
    1.306 Question #6: Is the PVC membrane to be adhered or mechanically attached?
    Response:
    Fully adhered with low VOC adhesive, full coverage of both coverboard and
    membrane.
    1.307 Question #7: Are we to replace the drain hub or install a retrofit drain?
    Response: Leave existing drain hub and install a retrofit drain.
    1.308 Question #8: Would like to know if GAF Products could be made acceptable for this application?
    Response: Please submit the roofing membrane cut sheet information for our review.
    1.309 Question 9: When will we be able to take a site tour of the roof?
    Response:
    The first site tour will be scheduled for Augusta 10, 2026 @ 1:30 PM sharp.
    We will meet at the Performing Arts Center (where the pre-bid was held)
    Enclosures:
    END OF ADDENDUM #1
    SIGNED BY:
    Robert L. Mauldin, NCARB, AIA
    Principal Architect, GA-RA-005958
    Pre-Bid Conference Agenda
    Sign-in Log
    Meeting Notes
    26+-24.03 Lakeside High School Roof Replacement
    2
    Z:\Active_Projects\2026 Projects\26-24 CCSD\26-24.03 Lakeside HS Roof Replacement\ADMINISTRATION\(BD) Bid Documents\4 - Addenda\Addendum #1.doc
    ADDENDUM # 1
    Project Name:
    Meeting Location:
    Purpose:
    NAME
    PRE-BID MEETING NOTES
    Lakeside High School Roof Replacement
    Project No.:
    Lakeside High School
    533 Blue Ridge Dr., Evans, GA 30809
    Pre-Bid Conference
    Date:
    Time:
    ATTENDEES
    FIRM
    2KM# 2026-24.03
    Facility Code: 636-0189
    August 4, 2026
    2:00 PM
    PHONE
    See Sign-in Log
    See Attached.
    ITEM
    DISCUSSION
    A. Reviewed Agenda in detail (See attached Agenda)
    1. Rob Mauldin and Chris Lehi, 2KM Architects, were introduced as A/E Team.
    COMMENT
    2. Chris Lehi, 2KM Architects, made introductions for Columbia County School
    District (CCSD).
    a. Tim Beatty – CCSD Chief Facilities Officer.
    3. All parties signed in.
    4. Architect of Record: 2KM Architects, Inc., Robert Mauldin, Principal Architect.
    5. C. Lehi outlined the building scope of work:
    a. Roof:
    1) Overlay existing low-slope roof with insulation, ½” recover board & new
    KEE membrane roof. 147,000 Sq. Ft.
    2) Reflash base of penthouse & parapets to roof transition.
    3) Add splash-blocks at downspouts at upper roof gutters/downspouts with
    slip-sheet.
    4) Replace existing gutters and downspouts.
    B. Schedule:
    1. Bid date August 18, 2026 at 2:00 p.m.
    a. Bid Opening to be held at the Columbia County Board of Education,
    4781 Hereford Farm Road, Evans, GA 30809.
    2. Construction Days: 180 days
    3. Contractors to read Bid Requirements very carefully and submit all required
    documents per the CCSD Bid Submittal Process.
    4. All prior approvals and questions must be submitted prior to the end of the day
    Wednesday, August 12, 2026.
    C. Jobsite:
    1. Work on Site – protect areas of work from access by students.
    a. Protect staff, visitors and students from areas of work or hazards.
    b. All workers must wear identifiable clothing and have a government issued
    Photo I.D on them at all times.
    2. Project work will begin upon Notice to Proceed, late August 2026.
    D. Site tour was conducted with contractors.
    1. Bid Date/Time.
    E. Miscellaneous Discussion:
    1. Site visits are allowed and must be coordinated with the Architects Office and
    Owner.
    2. This project has a mandatory Pre-Bid meeting, contractors on site are the only ones
    that may bid the project.
    3. Work hours will be determined once project gets under way with input from owner,
    facility and contractor. School hours are 7:30 AM – 2:30 PM but due to project
    location, should not interfere with work.
    2KM Architects, Inc.
    529 Greene Street
    Phone: 706-736-3333
    1
    Email: mail@2kmarchitects.com Augusta, Georgia 30901
    Fax: 706-736-7100
    \\nas-2km-1\2km_files\Active_Projects\2026 Projects\26-24 CCSD\26-24.03 Lakeside HS Roof Replacement\ADMINISTRATION\(BD) Bid Documents\3 - Pre-Bid\26-24.03 Pre-Bid Meeting Minutes.docx
    F. All questions should be issued in writing via email to: clehi@2kmarchitects.com.
    Call to verify receipt.
    G. Meeting Adjourned.
    Please notify the recorder of these minutes of corrections within 10 days of receipt.
    Meeting minutes Submitted by: Christopher S. Lehi
    Christopher S. Lehi
    Project Manager/Senior Contract Administrator
    Meeting minutes approved by: Robert L. Mauldin
    Robert L. Mauldin NCARB, AIA
    Principal Architect, GA-RA-005958
    Encl: Agenda
    SIS
    cc: CCSD, 2KM, Attendees
    2KM Architects, Inc.
    529 Greene Street
    Phone: 706-736-3333
    2
    Email: mail@2kmarchitects.com Augusta, Georgia 30901
    Fax: 706-736-7100
    \\nas-2km-1\2km_files\Active_Projects\2026 Projects\26-24 CCSD\26-24.03 Lakeside HS Roof Replacement\ADMINISTRATION\(BD) Bid Documents\3 - Pre-Bid\26-24.03 Pre-Bid Meeting Minutes.docx
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...Stripling ES - Roof Replacement Gwinnett County Public Schools Sep 15, 2026 @ ...

    State Government of Georgia

    Bid Due: 10/20/2026

    ...Bid Number: 47-014 Bid Title: Hall County Jail Roof Replacement Category: Bids & ...

    Hall County

    Bid Due: 9/17/2026

    ...Chattahoochee ES & Magill ES - Roof Replacement Gwinnett County Public Schools Sep ...

    State Government of Georgia

    Bid Due: 10/20/2026

    ...BID NAME: Stripling Elementary School - Roof Replacement BID DATE: 10/20/2026...

    Gwinnett County Public Schools

    Bid Due: 10/20/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.