Notice is hereby given that sealed proposals will be received by the City of Arlington Public Works Department, 154 W. Cox, Arlington, Washington 98223, until 2:00 PM, local time on January 9th, 2025, for furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to perform the project.
A non-mandatory pre-bid meeting to discuss the project and DBE required paperwork, will be held on Thursday January 2nd 2025, at 2:30pm at the above location.
The work shall include furnishing all labor, materials, and equipment to install erosion and water pollution control; removal of existing sidewalk, pavement, and subgrade; clear and grub existing landscaping; base course placement and grading; asphalt paving; construction of storm water conveyance, water main and drainage structures; constructing curb and gutter, sidewalk, ADA curb ramps; installing illumination; installing traffic signals; installing bus shelter pads; installing pavement markings and signing; performing traffic control; and miscellaneous items necessary to complete the project. The Engineer’s Estimate for this project is $1,400,000.00.
All bidding and construction is to be performed in compliance with the Contract Documents for this project and any Addenda issued thereto, which are on file with the City of Arlington Public Works Department.
Proposals received after the date and time stated above will not be considered. Immediately following the deadline for submission, the proposals will be publicly opened and read aloud in the Stillaguamish Conference Room at the Public Works Administration Building located at 154 W. Cox Ave, Arlington, WA 98223. Proposals must be submitted on the forms provided with the contract documents. All proposals must be accompanied by a bid deposit in the form of a certified or cashier’s check, or bid bond, for not less than five percent (5%) of the total amount bid, including additives and alternates, if any. Refer to Instructions to Bidders for more information. Should the successful Bidder fail to enter into such contract and furnish satisfactory payment and performance bonds within the time stated in the specifications, the bid deposit shall be forfeited to the City of Arlington.
Plans
Project Manual