BID 26-001 COG Kincaid and Hamilton Intersection Realignment and East College Street Sidewalk

Location: Georgia
Posted: Jul 30, 2025
Due: Sep 4, 2025
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • 89 - Subsistence (Food)
Solicitation No: PE-72650-NONST-2026-000000034
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-72650-NONST-2026-000000034 BID 26-001 COG Kincaid and Hamilton Intersection Realignment and East College Street Sidewalk Griffin , City Of
Jul 30, 2025 @ 04:04 PM
Sep 04, 2025 @ 02:00 PM
BID 26-001 COG Kincaid and Hamilton Intersection Realignment and East College Street Sidewalk

Start Date: Jul 30, 2025 @ 04:04 PM ET

End Date:
Sep 04, 2025 @ 02:00 PM ET

Event ID: PE-72650-NONST-2026-000000034
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: city
Fiscal Year: 2026


Description


Project A ¿ Hamilton Boulevard Realignment
The project consists of the demolition and relocation of approximately 386 linear feet of 24-foot-wide local street along with milling and new overlay of the remaining 1,259 linear feet of existing roadway. The street construction includes asphalt paving and concrete curb and gutter. Utility work on the project includes replacement of the existing 18-inch storm pipe system and two catch basins and installation of approximately 1,661 linear feet of 12¿ C900 PVC water main and related appurtenances. A new 5-foot-wide sidewalk is to be constructed on the relocated section of the street and along the remainder of the existing street totaling 1,435 linear feet. A Contech steel pedestrian bridge with concrete abutments will be constructed for a sidewalk creek crossing.Project B ¿ Hamilton Boulevard Overlay
The project also consists of approximately 1,440 square yards of milling and paving on Hamilton Boulevard east of Memorial Drive to the City of Griffin city limits. The milling and paving includes thermoplastic striping and minor concrete work at driveways.Project C ¿ E. College Street Sidewalk
The project consists of the installation of approximately 2,450 linear feet of 5-foot-wide sidewalk and related grading. The construction driveway will require modifications on College Street and removal of shrubs and trees.

NIGP Codes
Code Description
91355 Construction, Tunnel
91384 Maintenance and Repair, Streets, Major and Residential
91395 Paving and Resurfacing, Highway and Road
91350 Construction, Streets, Major and Residential, Including Reconstruction
BuyerContact:

April Meeks
afmeeks@cityofgriffin.com

770-229-6621

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...RFP 26-009 Pipe Rehabilitation, Pipe Lining Sugar Hill, City Of May 14, 2026 ...

State Government of Georgia

Bid Due: 6/18/2026

...reinforced concrete pipe (RCP), installation of a new standard headwall with stone veneer, ...

City of Sandy Springs

Bid Due: 7/07/2026

..., Albany, Georgia 31701, until 2:30 p.m. on June 10, 2026, for all ...

State Government of Georgia

Bid Due: 6/10/2026

...System, Plants, Main and Service Line 91338 Construction, Chilled Water Pipe Installation 91341..., ...

State Government of Georgia

Bid Due: 6/29/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.