South Campus Workforce Innovations Center

Location: North Carolina
Posted: Dec 3, 2025
Due: Jan 14, 2026
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • D - Automatic Data Processing and Telecommunication Services
Solicitation No: 121-120325DC
Publication URL: To access bid details, please log in.
Solicitation Number: 121-120325DC
Project Title: South Campus Workforce Innovations Center
Description: This request for qualifications is for architectural design services for the design of the $55,272,000 Workforce Innovation Center at Rowan-Cabarrus Community College’s (RCCC) South Campus in Kannapolis, NC. The project is envisioned to include the design and construction of one (1) new building.
Opening Date: 1/14/2026 2:00 PM
Posted Date: 12/4/2025
Status: Open
Department: ROWAN-CABARRUS COMMUNITY COLLEGE
Solicitation Number
*
121-120325DC
Department
ROWAN-CABARRUS COMMUNITY COLLEGE
Status Reason
Open
Opening Date
2026-01-14T14:00:00.0000000
Posted Date
*
2025-12-03T22:05:52.0000000Z
Commodity Code
Design Services
Mandatory Conference/Site Visit
Special Instructions
Electronic Submissions Only
Solicitation Type
*
Select RFP IFB RFI
Owner
Ronda Holland
Description
This request for qualifications is for architectural design services for the design of the $55,272,000 Workforce Innovation Center at Rowan-Cabarrus Community College’s (RCCC) South Campus in Kannapolis, NC. The project is envisioned to include the design and construction of one (1) new building.
Attachments

Attachment Preview

RFQ # 121-120325DC
Department/Agency
Project Title
Design Services
Scope
Rowan-Cabarrus Community College
South Campus Workforce Innovation Center
Architectural Design Services
This request for qualifications is for architectural design services for the design
of the $55,272,000 Workforce Innovation Center at Rowan-Cabarrus Community
College’s (RCCC) South Campus in Kannapolis, NC. The project is envisioned to
include the design and construction of one (1) new building.
It is envisioned that the building will house classrooms, labs, and support
spaces as well as large, flexible multi-purpose seminar rooms with supporting
spaces. The building is envisioned to be a roughly 70,000 square foot, three-
story building located on an undeveloped parcel across Trinity Church Rd from
South Campus in Kannapolis, NC. It is conceived to be a high-efficiency, steel
frame, with brick veneer to integrate into the design aesthetic of South Campus.
The project includes extensions of all utilities (power, data, water, sewer),
parking, and stormwater for the site and serves as the foundation for future
development on the east side of Trinity Church Road. The project also includes
a roughly 9,000 square foot Central Energy Plant incorporated into the 1st floor
to provide space for chillers and other infrastructure to support the ultimate
build-out of the area north of Trinity Church Road while acting as a teaching tool
for students learning about the next generation of mechanical systems
Contact
Telephone
Email
Total Project Budget
Source of Funds
Approved OC-25 #
Publish Date
Closing Date
Submittal Packages should be transmitted
to:
NC Licensing Statement
Specific goals for the project are addressed in the Workforce Innovation Center
Owners Project Requirements dated December 3, 2025. The scope of work for
this selection will include conceptual design, schematic design, design
development, and construction documents, but will not include construction
administration or close-out as the funding for the construction of the project has
yet to be secured. The project will include site development, building
construction, and fit-out yielding a fully functional facility. This project is
anticipated to be delivered under a CM at Risk delivery model. The project will
be designed and administered under State Construction Office requirements.
Ronda Holland
704-216-3455
collegeenvironment@rccc.edu
$55,000,000 Total Project Budget (inclusive of all soft costs)
Cabarrus County Bond
NCCCS # 2876
December 3, 2025
January 14, 2026 @ 2:00 PM
Electronic submissions only (Read Receipt Requested) to:
Email: collegeenvironment@rccc.edu
Please identify the RFQ # 121-120325DC and the Project Title in the subject line of the
email.
In order to offer architectural, engineering, or landscape architectural services in response
to this solicitation, the proposing firm must be properly licensed to practice Architecture,
Engineering, or Landscape Architecture in the State of North Carolina. More information on
the North Carolina state boards may be found at the following websites:
NC Board of Architecture: (http://www.ncbarch.org)
NC Board of Examiners for Engineers & Surveyors: (http://www.ncbels.org)
NC Board of Landscape Architects: (http://www.ncbola.org)
HUB firms are encouraged to submit proposals for this project.
RFQ # 121-120325DC
Rowan-Cabarrus Community College intends to select an Architectural Design firm to design the project. In selecting the
Architect, the College’s Selection Committee will take into consideration qualifying factors such as:
SELECTING CRITERIA
In selecting the architectural firm, the College’s Selection Committee will take into consideration qualifying factors addressed
below with their relative weighting:
1. Expertise and previous experience in the design of innovative, high-efficiency educational/institutional facilities (both Higher
Education and K-12). 20%
2. Demonstrated understanding of requirements under which Rowan-Cabarrus Community College must execute its capital
projects, including the RCCC Facilities Design Manual, the State Construction Manual and associated forms, NCCCS Capital
Improvement Guide, and the State Construction Office (SCO) project administration, including the Interscope System,
contractor pre-qualification, contracting, plan review, dispute resolution, and HUB tracking and reporting. 20%
3. Demonstrated understanding of campus master planning, and related pedestrian crossings of NC DOT high traffic roadway,
via bridging or tunnels. 5%
4. Demonstrated mastery of the following critical concepts in the design of public educational facilities: High efficiency facilities
(near net zero), Crime Prevention through Environmental Design (CPTED) and building security systems; integrated design;
creation of cost-efficient, flexible teaching spaces; and life cycle costing in the selection of construction materials and systems.
20%
5. Technical expertise in the following areas of building science: Passive House Institute US (PHIUS) Passive Building CORE
Commercial Standard, and/or WELL Building v2 design standards; low impact site design; noise control; geothermal systems;
and displacement ventilation. 20%
6. Qualifications and experience of proposed staff and consultant team. 10%
7. Quality of the proposal, including the inclusion of all the Submittal Requirements addressed below. 5%
8. After Selection Committee Members’ votes have been tallied and averaged, one half (1/2) additional point will be awarded to
Historically Underutilized Business (HUB) certified proposers. Teams with at least one HUB certified sub-consultant (necessary
to support the effort of this contract), will be awarded one half (1/2) additional point. A maximum of one (1) additional point may
be granted under this criterion.
Firms must be registered and active with the North Carolina Electronic Vendor Portal prior to submitting a proposal.
https://eve.nc.gov/ Failure to register may result in disqualification.
SUBMITTAL REQUIREMENTS
Proposing firms must submit one (1) electronic copy of the complete submittal package in Adobe.pdf format to the email address
provided: collegeenvironment@rccc.edu . Electronic submissions only (Read Receipt Requested).
Each package shall include in the following order:
1. A Letter of Interest – no more than one page. Letter of Interest should include Architectural License Number, E-Procurement
number, and SCO Vendor Number.
2. A design approach for the project, including discussion of achieving near net zero energy use; implementing CPTED to
design a secure facility; and selecting materials to achieve optimal acoustics for an educational environment, campus
master planning, and pedestrian roadway crossing. Include an organization chart demonstrating an understanding of the
College/SCO/Architect/CMR/Commissioning Agent relationship.
3. A proposed Gantt Chart Schedule for the Project from Conceptual Design through Completion,
4. A minimum of three (3) (but no more than six (6)) single page (front and back) examples of similar projects, including
photos and/or renderings, a description of pertinent elements, estimated and constructed cost (for completed projects),
and design and construction durations (in months).
5. Three (3) letters of recommendation from prior Higher Education clients for similar projects.
6. A listing of key sub-consultants to support the effort of this contract (Specialty Architects/Designers, Electrical,
Mechanical, Structural, Civil Engineers, Acoustical Engineer, Cost Consultant, Scheduling Consultant, Certified PHIUS
Consultant).
7. Resumes of key staff (Project Architects, Construction Administrators, Landscape Architect, Electrical Engineer,
Mechanical Engineer, Structural Engineer, Civil Engineer) proposed to support the design effort, including an indication of
other projects on which that individual will be concurrently assigned, and those anticipated project completion dates.
8. Standard Form 254 (SF 254) for the Architect and major sub-consultants. The current Standard Form 254 template is located
at http://www.nc-sco.com/forms.aspx which is the State Building Commission approved form.
9. Historically Underutilized Business (HUB) Certification for any entity proposed to support the effort of this contract.
10. Signed copy of all addendums issued to this advertisement.
Electronic submissions only (Read Receipt Requested).
Rowan-Cabarrus Community College
Workforce Innovation Center
Owner’s Project Requirements
December 3, 2025
Rowan-Cabarrus Community College
Workforce Innovation Center
Owner’s Project Requirements
December 3, 2025
Table of Contents
Introduction............………………………………………………….…………….........Pages 6 - 7
General Requirements…................................................................................................Pages 8 - 11
Technologies Building…….…………………………..……………………..………Pages 13 - 29
Supporting Documents
Facility Design Manual, Version 1.2, February 2024
https://www.rccc.edu/environservices/wp-
content/uploads/sites/46/2024/05/Facility_Design_Manual_2024-compressed.pdf
Rowan-Cabarrus Community College South Campus Facility Master Plan, 2022
Rowan-Cabarrus Community College
College Environment Division
Department of Planning and Capital Projects
2025
4
Rowan-Cabarrus Community College
Workforce Innovation Center
Owner’s Project Requirements
December 3, 2025
1. Introduction
This Draft RCCC Owner’s Project Requirements document captures in writing the initial concept for the
Workforce Innovation Center for Rowan-Cabarrus Community College’s South Campus in Kannapolis, NC.
This project is estimated to cost $55,272,000, however only funding for the design and preconstruction
efforts has currently been allocated. These Owner’s Project Requirements shall inform prospective
Architects, Construction Managers at Risk (CMR), Commissioning Agents (Cx), Sustainability Consultants,
etc. of the goals and requirements the Owner has created for the project. They should use this document
to evaluate their interest in the project, select their proposed teams, and guide the writing of their
proposals in response to the Request for Qualifications (RFQ) to show their alignment with the Owner’s
stated goals.
2. Vision
The Project is envisioned as:
A new building housing classrooms, labs, and related spaces as well as large, flexible multi-purpose
seminar rooms with supporting spaces. The building is envisioned to be a roughly 70,000 square foot,
three-story building located on an undeveloped parcel across Trinity Church Rd from South Campus
in Kannapolis, NC. It is conceived to be a high-efficiency, steel frame structure, with brick veneer to
integrate into the design aesthetic of South Campus. The project includes extensions of all roadways,
utilities, parking, and stormwater for the site and serves as the foundation for future development on
the east side of Trinity Church Road. The project also includes a Central Energy Plant designed on the
1st floor to provide space for chillers and other infrastructure to support the ultimate build-out of the
area north of Trinity Church Road while acting as a teaching tool for students learning about the next
generation of mechanical systems.
Specific goals for the project and individual buildings are addressed in this document.
3. Project Budget
3.1. The total project budget includes all project associated costs using the State Construction Office
Budget Breakdown:
3.1.1.Design
$ 5,822,000 Design with Consultants, Construction Admin, Close Out
3.1.2.Construction $46,000,000 Construction Fee and Costs
3.1.3.Contingency
3.1.4.Other Costs
$ 1,350,000 New Construction Contingency
$ 2,100,000 FF&E, 3rd Party Inspections and 3rd Party Consultants
3.1.5.Total Budget $55,272,000
4. Designer/CMR/CX/Sustainability Scopes of Work
The project will include site development, building construction, and fit-out yielding fully functional
facilities. The Architect shall seek all required approvals including zoning, annexation, handle bidding,
and administer the construction under a CM at Risk delivery model. The project will be designed and
administered as a formal project under State Construction Office requirements. The funding allocated
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Solicitation Number: 121-050126DC-Arch Project Title: Open-Ended Architectural Design Services... Description: Architectural design services ...

State Government of North Carolina

Bid Due: 6/16/2026

...for Qualifications: Architectural Programming and Design Services, for the Berkeley Ballpark... at Henderson ...

County of Henderson

Bid Due: 6/24/2026

..., Roofing Consultant Engineering and Landscape Architectural Design. Opening Date: 6/30/2026 3:00 PM..., ...

State Government of North Carolina

Bid Due: 6/30/2026

...Piedmont Community College is seeking architectural/engineering services for the design... architectural/engineering services for ...

State Government of North Carolina

Bid Due: 6/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.