| Location: | California |
|---|---|
| Posted: | May 4, 2026 |
| Due: | May 11, 2026 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 31100PR260000015 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SOLICITATION/OPPORTUNITY REOPENED DUE TO EXTENDED GOVERNMENT SHUTDOWN.
SEEKING NEW BIDS TO REFLECT ECONOMIC CHANGES
POC: Rachel Hanson: rachel.n.hanson@uscg.mil
Mr. Ruijin Garcia: ruijin.g.garcia@uscg.mil
Note: the KO is not onsite. Please direct specific site visit questions to the POC's listed above.
This project involves the corrective removal and replacement of 6 failing bathtub and shower pan assemblies that have developed cracks near the drain area due to improper installation. As part of this effort, all replacement tub and shower pan assemblies, surrounding materials and installation methods shall be standardized across all six units to ensure consistency, durability, and long-term maintenance efficiency. All housing units that require repair are currently occupied.
The Contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete the removal and replacement of tub and shower pan units and associated systems. Work must comply with current building codes, manufacturer installation requirements, industry best practices, and project standardization requirements. All six replacements must utilize the same approved tub/pan model, surround materials, waterproofing system, hardware, and installation methodology unless otherwise directed.
Please reference the attached SOW and documents to develop proposals and detailed pricing schedules.
Documentation showing past performance and certifications are required.
NOTE: FAR 52.212-2
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: technical capability, past performance, and price
Technical capability and past performance, when combined, are more imporant than price alone.
| Dec 19, 2025 | [Combined Synopsis/Solicitation (Original)] Bathroom Renovations for USCG STATION SANTA BARBARA RESIDENCIES |
| Dec 29, 2025 | [Combined Synopsis/Solicitation (Updated)] Bathroom Renovations for USCG STATION SANTA BARBARA RESIDENCIES |
| Dec 30, 2025 | [Combined Synopsis/Solicitation (Updated)] Bathroom Renovations for USCG STATION SANTA BARBARA RESIDENCIES |
| Jan 6, 2026 | [Combined Synopsis/Solicitation (Updated)] Bathroom Renovations for USCG STATION SANTA BARBARA RESIDENCIES |
| Jan 23, 2026 | [Combined Synopsis/Solicitation (Updated)] Bathroom Renovations for USCG STATION SANTA BARBARA RESIDENCIES |

With GovernmentContracts, you can:
...IFB R-26052 Propane Gas Refueling Stations Services (Re-bid) Status Stage Open Posted 5/22/2026... ...
City of Los Angeles
Bid Due: 6/18/2026
..., for the Corporation Yard Electric Vehicle Charging Stations project and other work ...
City of San Mateo
Bid Due: 6/25/2026
...Project ID: 25-110-RFP Title: Bryte Sewer Pump Station Rehabilitation Addenda: 0 Release Date: ...
City of West Sacramento
Bid Due: 6/11/2026
...Project ID: 2026-RFP-0123 Title: Design-Build Services for a Hydrogen Fueling Station Addenda: 4... ...
City of Pasadena
Bid Due: 6/18/2026