| Location: | Washington |
|---|---|
| Posted: | Aug 27, 2025 |
| Due: | Sep 17, 2025 |
| Agency: | City of Lynnwood |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 3900 |
| Publication URL: | To access bid details, please log in. |
Project ID: 3900
Title: RFQ to Provide Engineering Services (Construction Management and Construction Administration) for the Connecting Lynnwood: Poplar Way Bridge Project
Addenda: 0
Release Date: 8/27/2025
Due Date: 9/17/2025
The City will construct the new multimodal six-lane bridge over I-5 between the intersections of 196 th Street SW (State Route 524) & Poplar Way and 33rd Avenue W & Alderwood Mall Boulevard. The bridge will provide for multimodal travel with a sidewalk (west side) and shared use path (east side). The two intersections will be modified to meet the profile and width of the new bridge, and a tunnel (three-sided concrete box structure) will be constructed to allow the Interurban Trail to pass beneath the new bridge. Widening and restriping of portions of Poplar Way, 196th Street SW, Alderwood Mall Boulevard, 33rd Avenue W, and Alderwood Mall Parkway are also included.
The firm selected will assist the City of Lynnwood (City) with oversight of the construction activities performed by the awarded contractor.

With GovernmentContracts, you can:
...Post Date 05/20/2026 Quest Number 10209332 Category Code Buried Storage Tanks,Concrete Repair... ,Concrete ...
City of Wenatchee
Bid Due: 6/16/2026
...Subcontract Bid Package 03.1A CIP Concrete & Topping Assembly Addenda: 0 Release Date: ...
City of Seattle
Bid Due: 6/24/2026
...in Pacific Time Draft Response No Bid Time Remaining: 27 days, 18 hours, ...
Pierce County
Bid Due: 6/24/2026
...RSVP No Bid Time Remaining: 20 days, 18 hours, 44 minutes Post Information ...
Pierce County
Bid Due: 6/10/2026