Tower Village Elevator Replacement (Re-post)

Location: North Carolina
Posted: Mar 28, 2025
Due: Apr 7, 2025
Agency: North Carolina State University
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Institution UNC Greensboro
Institution URL for Additional
Information about this Project (Optional)
https://fac.uncg.edu/wp-content/uploads/20250326_307-Tower-Vg-Elev_DesignerAd_Repost.pdf
Project Name Tower Village Elevator Replacement (Re-post)
Type of Services Architectural/Engineering
Project Manager Wendi Stogner
Phone Number (336) 608-9418
Contact Email wcstogner@uncg.edu
Closing Date 04/07/2025
Project Budget
$ 950,000
Project Description One-Two Sentences
The University of North Carolina at Greensboro (UNCG) is seeking qualified design professionals for the full replacement of two hydraulic elevators in Tower Village, a residence hall on campus. The existing elevators, originally installed in 1993, have reached the end of their operational lifespan and require replacement to ensure continued safety, reliability, and compliance with current building codes. This project will replace one six-stop hydraulic elevator and one seven-stop hydraulic elevator, along with necessary upgrades to related building systems. The scope of work includes securing a designer to assess the existing elevator system, determine requirements for new hydraulic elevators, and prepare detailed construction documents for contractor bidding. The project will involve the removal and disposal of the two existing elevator systems, with necessary patching and repair of affected structural elements. The new elevator installation will include modern hydraulic systems with upgraded control panels, call stations, and emergency communication systems based on the new design. The project will also evaluate the existing ventilation and cooling systems serving the elevator mechanical rooms, with replacements or enhancements made as required to meet current standards. Fire and life safety compliance will be addressed through the assessment and replacement of fire-rated doors, smoke detectors, and heat detectors as needed. The existing electrical system will be evaluated, and electrical wiring, control panels, mechanical components, and emergency lighting will be replaced where required. The project will also include upgrades to ADA-compliant guide rails and cab interiors where necessary. The project must be completed with the renovated elevators fully operational and ready for occupancy by August 1, 2026. Letters of Interest due to fdc@uncg.edu by 12:00 p.m. on April 7, 2025
Submit Letters of Interest
and Current SF-330 to:
(Contact Person, Name of Institution & Address)
Electronic submissions only to Wendi Stogner, fdc@uncg.edu; UNC Greensboro Facilities Design & Construction
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

..., such as but not limited to smoke detectors, horns, strobes, heat detectors, ...

County of Carteret

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.