| Location: | Washington |
|---|---|
| Posted: | May 16, 2025 |
| Due: | Jun 2, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 6/2/25 1:00pm |
Spokane, WA
This project consists of the construction of approximately 466 linear feet of removing existing curb, 250 square yards of removing cement concrete sidewalk and driveway, 300 linear feet of ductile iron storm sewer, 14 each connect 8 inch dia. pipe to existing catch basin, drywell or manhole, 3,500 square yards of pavement repair, 3,900 linear foot inch of sawcutting flexible pavement, 665 linear foot inch of sawcutting rigid pavement, 12,oo0 linear feet of crack sealing, 14,750 square yards of planing bituminous pavement, 27,900 square yards of HMA Cl. ½ inch for pavement 2 inch thick, 900 linear feet of cement concrete curb, 253 square feet of cement concrete sidewalk, 17 each retrofit surface inlet, 21 each manhole/drywell cover, 39 each cleaning existing drainage structure, permanent signing, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
...Contract I-5/I-205, Concrete Panel Rehabilitation Contract summary Requires replacing cement... and other work. ...
State Government of Washington
Bid Due: 6/17/2026
...removing and replacing precast cement concrete panels (PCCP), grinding, removing and replacing... guardrail, ...
State Government of Washington
Bid Due: 6/10/2026
...roadway (grinding and mixing existing pavement, underlying gravel and subgrade with cement and ...
County of Cowlitz
Bid Due: 6/15/2026
...of roadway and building construction materials including, but not limited to: hot mix ...
City of Sequim
Bid Due: 6/19/2026