Statewide Elevator Inspection Services
Addendum 1
Addendum 2

06/19/2026 04:30PM


07/14/2026 04:30PM

Attachment Preview

Statewide Elevator Inspections
Various Locations
ADDENDUM # 2
State of Vermont
Department of Buildings and General Services
Office of Purchasing & Contracting
133 State Street
Montpelier, Vermont 05633-8000
7/1/2026
TO ALL BIDDERS OF RECORD:
This Addendum consists of (4) page(s).
Acknowledge receipt of this Addendum by entering its number and date on the Proposal Form. This Addendum forms
a part of the Contract Documents and modifies them as follows:
Items:
1. Please use the attached Revised Bid Schedule for your bid submission.
2. Questions & Answers
1. As we are reviewing the bid documents, we noticed the numbers in the pricing template do not mirror up with
the 86 devices listed in the RFP (pages 3-6). For example, on the pricing template you have a total of 168
which doesn’t equate, even if figuring two inspections per year (86x2). Also, the Registration Fees are for a
total of 166 units which is not consistent. Can you please verify and explain how you came up with your
totals? We have updated the totals and are in the attached updated Price schedule.
2.
a. Elevator Counts: The second column, which combines Year 1 and Year 2 pricing, contains an
incorrect count for elevators. I counted 16 cable elevators, which should result in a total of x32 rather
than x30. See updated Price Schedule
b. Pricing Categories: The State of Vermont separates hydraulic elevators into two distinct categories
for pricing. Additionally, platform lifts and stair climbers require separate pricing. I also noticed that
some of the totals in the second column are incorrect. See updated Price Schedule
c. Reinspections: These are dynamic, making it impossible to estimate the total number of elevators or
lifts that will require a reinspection for Year 1 and Year 2. While a fixed price per unit is acceptable, we
cannot accurately provide a total for those years. For re-inspections, provide a cost for one re-
inspection. The contract will carry a contingency based on that price times the average number of re-
inspections.
d. There should not be a registration fee section. Registration fees are collected when you register with
the Secretary of States Office as a company doing business in Vermont. Those fees cannot be waived.
The column on the price schedule was in error and has been removed.
Here is a copy of the Vermont Rules Pricing:
Rev 03.20.2026
Section 9.3: Fees: (a) An elevator inspector may charge a fee for an inspection required under these
rules. The fee shall include the $25 fee paid to the department for each authorized certificate of
operation and shall not exceed: (1) for electric traction elevators and escalators - $250, (2) for
hydraulic elevators greater than 3 stops - $225, (3) for hydraulic elevators with 2 or 3 stops - $200, (4)
for limited use/limited application elevators - $175, (5) for platform lifts - $150, (6) for residential
elevators and stairway chairlifts - $100.
3. It states the contract is for 5 years, yet it also asks for pricing for 2 years. How many years is this contract
for? The contract is for 5 years.
4. The State Elevator Board is currently updating its code, which includes a probable price increase. Since we
are regulated on what we can charge for inspections, predicting the increase is difficult.
If the board mandates a new price, will we be able to reflect that in the contract? If the board mandates a new
price, we will issue a change order to reflect the change in price accordingly.
5 Since reinspection are based on issued Conditional Certificates, will we receive a detailed list of units already
inspected to date, along with a list of the safety tests performed prior to inspections? Yes, upon award of the
contract.
6. Do "registration fees" refer to the stickers purchased from the board? As before, that price is currently $25 per
sticker, although it may increase soon. No. These fees are costs associated with registering as a business in
Vermont. That category was added to the price schedule in error. See updated price schedule. That category
has been removed.
7. To quote an accurate price schedule, will a detailed list showing When all units were last serviced and their
inspection expiration dates be available to us? All units were inspected in January of 2026.
8. The contract term is five years per Section 1.2, but the Price Schedule requests only Year 1 and Year 2
pricing. How will pricing be established for Years 3 through 5, and will the State allow an annual escalator for
those years? The contract will be for 5 years. Please provide pricing for years 1 through 5, on the updated Price
Schedule.
9. The inventory does not include certificate expiration or last-inspection dates. Will the State provide the
current due date and last-inspection date for each unit, and indicate how many units will be due or overdue at
the anticipated August 1 start date? We will provide that information, to awarded contractor.
10. Does "annual inspection" cover only the periodic no-load inspection, or are any five-year full-load tests
required during the contract term? For any load testing, will the State's maintenance vendor supply the
mechanic, rigging, and weights, or is that the inspection contractor's responsibility? The annual inspection
refers only to the annual fire safety inspection and any re-inspections of conditional certificates issues due to
violations needing to be addressed.
11. Section 2.17 limits subcontracting. If a bidder proposes to perform inspections using a named Vermont-
licensed inspector engaged on a partner or 1099 basis, will the State consider that subcontracting, and will it
approve subcontractors named in the proposal? The firm performing the inspections must have a Vermont
licensed inspector on staff. We will not accept partner or 1099 basis.
12. Can the State provide a reconciled equipment inventory, and confirm whether the Price Schedule quantities
(30 cable, 121 hydraulic, 17 electric lifts, 166 registrations) represent two-year totals? The listed inventory
totals approximately 86 units. See attached updated Price Schedule
13. What is the scope of the "Registration Fees" line item? Is it a State fee that the contractor passes through, or
a contractor administrative fee? Any fees levied by the Secretary of State or Department of Taxes are associated
with doing business in Vermont.
Rev 03.20.2026
14. Please confirm the specific insurance limits required under Attachment C, Section 8, including any
professional liability or errors and omissions coverage. These requirements can be found by clicking through
the Vermont State Insurance Specification link found on Attachment C Section 8, or by visiting
https://aoa.vermont.gov/Risk-Claims-COI
15. Will the award be a single statewide contract, or may it be split by district, and how is cost weighted against
the other evaluation criteria in Section 3.6.1? This will be one statewide contract.
END OF ADDENDUM # 2
Rev 03.20.2026
REVISED PRICE SCHEDULE
A. Fixed Price Deliverables:
Deliverable Description
Inspections Cable Elevator (x16)
Inspections Hydraulic Elevators ˃3 flrs (x27)
Inspections Hydraulic Elevators ˂3 flrs (x32)
Annual Inspections Electric Lifts (x6)
Inspections Stairway Chair Lifts (x3)
Re-inspection for Elevators
Re-inspections of Electric Lifts
Re-inspections Chair Lifts
Fixed
Price
$
$
$
$
$
$
$
$
TOTALS
NA
Year # 1
$
Year # 2 Year #3 Year #4 Year #5
$
$
$
$
Name of Bidder:
Signature of Bidder:
Date:
Rev 03.20.2026
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.