| Location: | North Carolina |
|---|---|
| Posted: | Jan 23, 2026 |
| Due: | Feb 17, 2026 |
| Agency: | North Carolina State University |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Institution | UNC Pembroke | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://www.uncp.edu/info-for/external-vendors.html | |||||
| Project Name | Campus Water Main Infrastructure Replacement - Phase Ill | |||||
| Type of Services | Engineering/Architectural | |||||
| Project Manager | Matt Greene | |||||
| Phone Number | ||||||
| Contact Email | matt.greene@uncp.edu | |||||
| Closing Date | 02/17/2026 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
The University of North Carolina at Pembroke (UNCP) is seeking letters of interest from qualified professionals to provide complete design and construction administration services for the Campus Water Main Infrastructure project to replace and/or rehabilitate aging underground water mains serving multiple campus buildings. The work typically includes selective demolition and excavation, installation of new water main piping and appurtenances (valves, hydrants, meters/backflow preventers as applicable), tie-ins to existing distribution, restoration of paving/sidewalks/landscaping, and coordination of temporary service to maintain continuous water supply during construction. Firms are requested to assure receipt of One (1) electronic copy via email in PDF format to the project contact with a copy to douglas.hall@uncp.edu by Noon on 02/17/2026 . The current schedule is: - 02/03/2026 Pre -Submittal Meeting @ 11am (virtual via Webex URL above) - 02/27/2026 Finalists Notified - 03/17/2026 Interviews (Virtual) So that the selection process is as objective as possible, from the date of this public announcement, applicants are not to communicate with members of the Board of Trustees, Campus Officials, and staff other than the Project Contact. All communications to the project contact are to be via email only, and addressed to Matt Greene at matt.greene@uncp.edu with a copy to Douglas Hall at douglas.hall@uncp.edu.
|
|||||
|
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
UNC Pembroke Matt Green Project Manager Facilities Planning, Design and Construction 1 University Drive Pembroke, NC 28372
|

With GovernmentContracts, you can:
...the renovation of a 10,481 square foot existing two-story building. Renovations include selective ...
Craven County Government
Bid Due: 6/30/2026
..., surface and tree root protection, selective tree removal, and demolition. Installation of ...
State Government of North Carolina
Bid Due: 6/17/2026
...) Selective Demolition; (BP03) Cast-in-Place Concrete; (BP06) Architectural Wood Casework; (BP07) Sheet...
State Government of North Carolina
Bid Due: 6/19/2026
...selective demolition, replacement of the existing low-sloped ballasted EPDM roof system with a ...
State Government of North Carolina
Bid Due: 6/25/2026