| Location: | Washington |
|---|---|
| Posted: | Aug 28, 2025 |
| Due: | Sep 9, 2025 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP-2025-01 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project primarily includes: Replacement of the existing chiller and chilled water pumps; Replacement of the existing boiler and hot water pumps; Revision of existing air handling units; Installation of new terminal units; Installation and/ or replacement of motorized dampers; replacement in place of the building service panelboard, and replacement of electrical branch circuits serving the above listed mechanical equipment. Cutting, patching, and painting of interior and exterior components of the building as required to properly integrate and conceal the new work, and replacement of exterior door and frame. A complete description is included in the accompanying bid documents.

With GovernmentContracts, you can:
...(MBTs), chain locker and sump, superstructure (interior/exterior, voids and safety track... will include ...
DEPT OF DEFENSE
Bid Due: 6/05/2026