| Location: | Washington |
|---|---|
| Posted: | Aug 28, 2025 |
| Due: | Sep 9, 2025 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP-2025-01 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project primarily includes: Replacement of the existing chiller and chilled water pumps; Replacement of the existing boiler and hot water pumps; Revision of existing air handling units; Installation of new terminal units; Installation and/ or replacement of motorized dampers; replacement in place of the building service panelboard, and replacement of electrical branch circuits serving the above listed mechanical equipment. Cutting, patching, and painting of interior and exterior components of the building as required to properly integrate and conceal the new work, and replacement of exterior door and frame. A complete description is included in the accompanying bid documents.

With GovernmentContracts, you can:
...REPLACEMENT, PATCHING AND REMOVAL OF EXISTING INTERIOR WALLS, CEILINGS, FINISHES, AND ELECTRICAL... DEMOLITION, ...
Port of Seattle
Bid Due: 10/22/2026
...and placing new asphalt paving and patching, asphalt overlays and overlay fabric, application ...
Port of Seattle
Bid Due: 9/29/2026
..., install six 48" Type 2 catch basins, install one Type 1L catch ...
Anacortes city
Bid Due: 9/30/2026
...and numbering parking spaces, pavement patching and snow and ice removal; (iii) maintenance...
State Government of Washington
Bid Due: 11/01/2026