| Location: | Washington |
|---|---|
| Posted: | Aug 28, 2025 |
| Due: | Sep 11, 2025 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes the following actions:
1. Remove existing solid timber pier, gangway, and floats and replace them with new materials.
2. Remove one existing offshore island floating dock and timber piles.
3. Replace existing timber framed and creosote dolphin supported offshore island floating dock with steel piles and steel framed floats with grated decking.
4. Remove existing creosote dolphins supporting the boat sewage pump-out barge and replace with steel piles.

With GovernmentContracts, you can:
Basic Information Solicitation Number MC-0321006_2.1.01 Title Seattle-Tacoma International Airport South Concourse Evolution (SCE),
Port of Seattle
Bid Due: 10/15/2026
Solicitation Information Title Enterprise Resource Planning (ERP) System Request for Proposal Reference Number
State Government of Washington
Bid Due: 10/16/2026
Basic Information Solicitation Number MC-0322824 Title Rental Car Facility (RCF) Quick Turn Around
Port of Seattle
Bid Due: 10/01/2026
Project ID: Title: Nisqually Rd SW (Nisqually River to I-5 Northbound Ramp). CRP
Pierce County
Bid Due: 9/30/2026