| Location: | Washington |
|---|---|
| Posted: | Aug 28, 2025 |
| Due: | Sep 11, 2025 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes the following actions:
1. Remove existing solid timber pier, gangway, and floats and replace them with new materials.
2. Remove one existing offshore island floating dock and timber piles.
3. Replace existing timber framed and creosote dolphin supported offshore island floating dock with steel piles and steel framed floats with grated decking.
4. Remove existing creosote dolphins supporting the boat sewage pump-out barge and replace with steel piles.

With GovernmentContracts, you can:
...of Government-owned recreation facilities, and equipment, to the Fields Point Landing Area on ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/15/2026
...and Recreation Industries Place of Performance: Forks , WA 98331 USA Description On ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 8/05/2026