| Location: | North Carolina |
|---|---|
| Posted: | Mar 13, 2026 |
| Due: | Apr 10, 2026 |
| Agency: | North Carolina State University |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Institution | UNC - Chapel Hill Academic Affairs | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://facilities.unc.edu/resources/vendor-opportunities/ | |||||
| Project Name | Housing Renewal Phase 2 (Parker Teague Halls Demo & Replacement) | |||||
| Project Manager | Quade T Gallagher | |||||
| Phone Number | (984) 484-4113 | |||||
| Contact Email | quadeg@unc.edu | |||||
| Pre-proposal Date | 03/23/2026 | |||||
| Pre-proposal Time | 11:00 am | |||||
| Pre-proposal Location | https://unc.zoom.us/j/5653249938?omn=93917904388&from=addon | |||||
| Closing Date | 04/10/2026 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
To address increasing enrollment and the need to expand existing housing stock, UNC Chapel Hill seeks to redevelop the site of Parker and Teague Residence Halls on the main campus. The current buildings house upperclass students in semi-suites containing four bedrooms sharing a bathroom with no common space within the suite. It is not predetermined if the redevelopment will result in a single, new residence hall or two separate buildings. The new residence hall(s) will accommodate approximately 550 to 600 upperclass residents in single and double rooms (likely in a similar semi-suite configuration as the current buildings) and should include both interior and exterior amenities. A dining facility space is not anticipated to be part of this project; however, there may be opportunities for smaller scale shell space for an outside vendor, such as a cafe. The University is currently engaged in the planning and design of several capital projects in close proximity to this site, so the team selected for this project will need to coordinate with the work of those other projects. The project is approved to proceed with Advanced Planning. The working budget for the project is $120 million, which includes soft costs, construction, and escalation. The project is currently in the Advanced Planning Phase, which is anticipated to conclude in mid-May. The project schedule is full occupancy by July 1st, 2030.
|
|||||
| Submit To |
Note: (1) one electronic PDF file of the submittal is required via email or share file. Please note that the University's file size limit for attachments from external emails is 50 MB. You will receive a confirmation email once your submission has been received. All submissions are required to follow the GSA SF-330 format and adhere to the criteria stated in these instructions and any subsequent addenda issued by the University. Submissions shall be limited to 50 pages total. The file name of the PDF shall be: UNC-CH Parker Teague_CMR Qualifications Submission_[firm name]. Submit to: Quade T Gallagher quade@unc.edu
|

With GovernmentContracts, you can:
...Planning for the Health Sciences Laupus Library Reading Room. Approximate area of the ...
North Carolina State University
Bid Due: 6/15/2026
...to perform a space analysis and feasibility study to determine whether a renovation ...
North Carolina State University
Bid Due: 6/12/2026
...SOUGHT NOTICE (SSN) ONLY. This SSN is issued solely for information and planning ...
TREASURY, DEPARTMENT OF THE
Bid Due: 6/05/2026