| Location: | California |
|---|---|
| Posted: | Mar 13, 2026 |
| Due: | Mar 31, 2026 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 943719.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | UCLA Westwood Center Suite 300 Reconfiguration - Low Voltage Cabling |
| Project Number | 943719.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited for the following work:
Contractor shall provide the following: Remove existing data cabling and provide new cabling utilizing the existing network switch in Telecommunication Room 318x (TR-318x). Provide upgraded CAT6A ethernet cabling coordinating with the furniture installation schedule. Provide EZ-Path fire sleeves into TR-318x. Reference drawings and specifications for the detailed scope of work. The estimated construction cost is $125,000. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $125,000.00 |
| 946515.01 |

With GovernmentContracts, you can:
Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:
City of Monrovia
Bid Due: 8/19/2026
RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and
City of Visalia
Bid Due: 9/03/2026
0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK
City of Los Angeles
Bid Due: 8/11/2026
RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL
County of San Diego
Bid Due: 8/07/2026