Bids will be received electronically online only by the City of Apple Valley, Minnesota, through Quest CDN, until 2:00 P.M., CST, Tuesday, April 14, 2026 at which time they will be reviewed for the furnishing of all labor, materials, and all else necessary for the following:
City Project 2019-106 147
th
St W Street Improvements
139 EA CLEARING
139 EA GRUBBING
583 LF REMOVE WATER MAIN
1,298 LF REMOVE SEWER PIPE (STORM)
7,392 LF REMOVE CURB AND GUTTER
15,790 SY REMOVE BITUMINOUS PAVEMENT
55 EA REMOVE LIGHT FOUNDATION
13,407 CY EXCAVATION – COMMON
7,270 CY EXCAVATION – SUBGRADE
5,293 SY MILL BITUMINOUS SURFACE (2.0”)
2,050 SY MILL BITUMINOUS SURFACE (4.0”)
165 SY CONCRETE PAVEMENT (8.0”)
110 SY CONCRETE PAVEMENT 8.0” COLORED
8,313 TN BITUMINOUS MIXTURE
208 SF SEGMENTAL BLOCK WALL
82 EA BRICK COLUMNS (16” SQUARE, 3’6” HT)
33 LF PVC PIPE SEWER
1,658 LF 24” PERF PE PIPE DRAIN
2,608 LF RC PIPE SEWER
260 LF DRAINAGE STRUCTURE
5 EA DRAINAGE STRUCTURE DESIGN SPECIAL 1-5 (BMP PRETREATMENT)
1 EA REPAIR SEWER PIPE SPECIAL
5 EA HYDRANT
510 LF WATERMAIN (DIP)
40 LF CONSTRUCT SANITARY STRUCTURE
44,830 SF CONCRETE WALK
7,914 SF COLORED CONCRETE WALK
23,767 SF COLORED AND STAMPED CONCRETE WALK
11,005 LF CONCRETE CURB AND GUTTER
4,489 LF CONCRETE CURB DESIGN V
982 LF PORTABLE PRECAST CONCRETE BARRIER – ANCHORED
11 EA METAL BENCH (6’0”)
11 EA METAL TRASH RECEPTACLE
11 EA METAL RECYCLING RECEPTACLE
1,000 LF ORNAMENTAL ALUMINUM FENCE – 36” HEIGHT SURFACE MOUNT
38 EA LIGHTING UNIT
2 EA SERVICE CABINET (LIGHTING)
1 SYS PEDESTRIAN CROSSWALK FLASHER SYSTEM
2 SYS REVISE SIGNAL SYSTEM
96 EA TREE (B&B)
1,504 EA SHRUB (CONTAINER)
131 EA PERENNIAL (CONTAINER)
5,740 SY RAPID STABILIZATION METHOD 3
2,830 SY SODDING
1,940 LB HYDRAULIC STABILIZED FIBER MATRIX
12,949 LF PAVEMENT MARKING
1,861 SF PAVEMENT MESSAGE
With related items
Digital copies of the Contract Documents can be obtained at
www.questcdn.com
. The Quest CDN project number is 9998738. Bidders can download the Contract documents for $40 by searching for the project on Quest CDN website’s Project Search page.
Instructions for online bidding are attached. Please contact QuestCDN.com, prior to bidding, at (952) 233-1632 for assistance with free membership registration, downloading, and submitting bids. For electronic bids, electronic bid bonds will also be accepted through Surety 2000 using contract #9998738. The bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond.
Any, and all questions bidders may have in connection with this solicitation are to be directed by email only to:
For security reasons, you must enable JavaScript to view this E-mail address..
No bidder questions will be addressed after 12:00 pm on Friday, April 10, 2026.
Bid Security in the amount of 5 percent of the amount of the Bid must be submitted through Surety 2000 and accompany each Bid in accordance with the Instructions to Bidders.
The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids.
The successful bidder must be a “responsible contractor.” The term “responsible contractor” means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor.
The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner.
This project is subject to Minnesota Department of Labor and Industry Prevailing Wage and Truck Rental Rates.
Christina M. Scipioni, City Clerk
City of Apple Valley, Minnesota