The Project includes the following Work:
The work consists of two primary components.
The first is constructing the Assonet Pump Station, Cole River Pump Station, RK Pump Station, and Swansea Mall Pump Station; including precast concrete wet well, valve vault, meter vault, sewer force mains, gravity sewer, water service, electrical and control equipment, paving, fencing, site lighting, site grading and restoration, equipment start-up and pump station commissioning.
The second is, the installation of gravity sewer mains, manhole structures, force mains, air release valves and structures, force main cleanout structures, sewer laterals, directional drilling of force main, trench paving and site restoration, and all performance testing to construct the sewer collection system in the area generally described as the Route 6 Corridor and as shown on the plans.

With GovernmentContracts, you can:
IFB-Water meters November 2, 2026 Town of North Andover, MA Notice-water-meters.pdf Notice- Invitation
Town of North Andover
Bid Due: 11/18/2026
Bid Number: PW-27-04 Bid Title: STORM DRAIN PIPELINE AND STRUCTURE CLEANING AND CCTV
Town of Tewksbury
Bid Due: 11/19/2026
LIQUID EMULSION POLYMER DEER ISLAND TREATMENT Event: 6866-0 Reference: WRA- 5891 REQ 318822
Massachusetts Water Resources Authority
Bid Due: 11/17/2026
Header Information Bid Number: BD-27-1068-1700-1-135084 Description: Underage Access To Sports Wagering Platforms Research
Commonwealth of Massachusetts
Bid Due: 12/15/2026