| Location: | Massachusetts |
|---|---|
| Posted: | Aug 26, 2025 |
| Due: | Sep 4, 2025 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
The work consists of two primary components.
The first is constructing the Assonet Pump Station, Cole River Pump Station, RK Pump Station, and Swansea Mall Pump Station; including precast concrete wet well, valve vault, meter vault, sewer force mains, gravity sewer, water service, electrical and control equipment, paving, fencing, site lighting, site grading and restoration, equipment start-up and pump station commissioning.
The second is, the installation of gravity sewer mains, manhole structures, force mains, air release valves and structures, force main cleanout structures, sewer laterals, directional drilling of force main, trench paving and site restoration, and all performance testing to construct the sewer collection system in the area generally described as the Route 6 Corridor and as shown on the plans.

With GovernmentContracts, you can:
...control panel, removal and replacement of two variable frequency drives, two new sine ...
Wright-Pierce
Bid Due: 6/23/2026
...Header Information Bid Number: BD-26-1208-MCCA1-MCCA1-130158 Description: S38 MCEC Board Room AV... have full ...
Commonwealth of Massachusetts
Bid Due: 6/29/2026
...TRANSIT STATION PLATFORM SCREEN DOORS Ship-to Address: Procurement & Logistics 10 Park Plaza ...
Commonwealth of Massachusetts
Bid Due: 6/18/2026
...title detail important dates posted date plan holders MCEC Board Room AV Upgrades ...
Massachusetts Convention Center Authority
Bid Due: 6/29/2026