| Location: | Massachusetts |
|---|---|
| Posted: | Aug 26, 2025 |
| Due: | Sep 4, 2025 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
The work consists of two primary components.
The first is constructing the Assonet Pump Station, Cole River Pump Station, RK Pump Station, and Swansea Mall Pump Station; including precast concrete wet well, valve vault, meter vault, sewer force mains, gravity sewer, water service, electrical and control equipment, paving, fencing, site lighting, site grading and restoration, equipment start-up and pump station commissioning.
The second is, the installation of gravity sewer mains, manhole structures, force mains, air release valves and structures, force main cleanout structures, sewer laterals, directional drilling of force main, trench paving and site restoration, and all performance testing to construct the sewer collection system in the area generally described as the Route 6 Corridor and as shown on the plans.

With GovernmentContracts, you can:
...STATION PLATFORM SCREEN DOORS Bid Opening Date: 06/18/2026 02:00:00 PM Purchaser: Rob Weiner ...
Commonwealth of Massachusetts
Bid Due: 6/18/2026
...Lower Artichoke Raw Water Pump Station Upgrades Bid Number: IFB No. 26-23 Start ...
Newburyport city
Bid Due: 6/11/2026
...of existing underground power/control conduit from Taylor Station to the Taylor Well site, ...
Wright-Pierce
Bid Due: 6/23/2026
...Header Information Bid Number: BD-25-1492-FAC41-F410-130169 Description: Entrance Gate and Control... Station, 280 Driftway, ...
Commonwealth of Massachusetts
Bid Due: 7/02/2026