| Location: | California |
|---|---|
| Posted: | Jan 14, 2025 |
| Due: | Feb 26, 2025 |
| Agency: | East Bay Municipal Utility District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
[Sign In] Current Construction Bid Opportunities |
| Title: | Mokelumne Aqueduct No. 2 Relining Phase 2 |
| Specification Number: | 2199 |
| Bid Walk: |
Wednesday, February 5, 2025, 10:00 AM
The District will conduct a pre-bid jobsite inspection tour to familiarize prospective bidders with the project site and conditions. The inspection will be conducted on February 5, 2025 at 10 a.m. Bidders/bid walk attendees (Attendees) shall comply with any San Joaquin County health orders. Attendees shall assemble at the eastern end of Woodward Island Bridge, off Bacon Island Road. This is the only time that the work area will be open for inspection. The inspection will last approximately 2 hours. The Prime Contractor and its subcontractors are strongly encouraged to attend the jobsite inspection where a "sign-in" sheet will be provided. A video with the requirements of the District's Contract Equity Program including the Local Hire component will be posted on the project webpage. For pre-bid jobsite inspection questions only, call Benjamin Townley at (510) 287-2147. |
| Project Engineer: | S. Garcia |
| Bid Opening Date: | Wednesday, February 26, 2025, 1:30 PM |
| Estimated Cost: | $6,000,000 to $6,500,000 |
| Description: | Work includes removal of existing cement mortar lining and application of new 5/8"-thick cement mortar lining, in-place, for approximately 7,500 linear feet of above ground 67-inch diameter steel pipe; removal of pipe spool pieces and installation of new pipe spool pieces, for cement mortar lining removal and application work; installation of new aqueduct manholes for cement mortar lining removal and application work; removal and installation of expansion joint packing material; repair 15,500 linear feet of north and south access roads; and installation of approximately 2,350 linear feet of access road improvements. |

With GovernmentContracts, you can:
...- Cement pumping services 72152700 Special trade construction & maint srvcs - Concrete...
State Government of California
Bid Due: 6/16/2026
...by means of full depth reclamation via cement treatment (FDR-C) at Tower Road ...
City of American Canyon
Bid Due: 7/09/2026
...required paving materials include both Asphalt Concrete (AC) and Portland Cement Concrete (PCC...
DEPT OF DEFENSE
Bid Due: 6/09/2026